Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 117    Reach ID: T3.12S1.01    Stream Name: Sub Trib 1 to Reach 12 to Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 20 ft. 0.5 %  
  Impact Not Significant  
5.3 Bank Armoring None Project Default
  Left Right  
  Length 0 ft. 0 ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening Project Default
  Length / Percent 266 ft. 6.3 %  
  Impact Low  
5.5 Dredging History None Project Default
  Impact Not Significant