Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 118    Reach ID: T8.S3.01    Stream Name: Dover Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 245 ft. 9.7 %  
  Impact Low  
5.3 Bank Armoring Project Default
  Left Right  
  Length 695 ft. 253 ft.  
  Percent 37.5 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 1,639 ft. 64.8 %  
  Impact High  
5.5 Dredging History None Project Default
  Impact Not Significant