Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 114    Reach ID: T8.06    Stream Name: Wardsboro Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 240 ft. 3.6 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 196 ft. 1,749 ft.  
  Percent 28.8 %  
  Length (old) %  
  Impact High  
5.4 Channel Straightening Project Default
  Length / Percent 4,612 ft. 68.2 %  
  Impact High  
5.5 Dredging History Dredging Interviews - DEC, NRCS
  Impact High