Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Winooski Mid, Alder to Montp

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 125    Reach ID: R16.S2.03-S1.01    Stream Name: Herring Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 1  
  Reach Length / Percent 41 ft. 0.8 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 308 ft. 260 ft.  
  Percent 11.5 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening Project Default
  Length / Percent 832 ft. 16.9 %  
  Impact Low  
5.5 Dredging History None Project Default
  Impact Not Significant