5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 4  
  Reach Length / Percent 218 ft. 2.2 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 24 ft. 1,156 ft.  
  Percent 11.9 %  
  Length (old) %  
  Impact Low  
5.4 Channel Straightening Project Default
  Length / Percent 6,878 ft. 69.6 %  
  Impact High  
5.5 Dredging History Gravel Mining Project Default