Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 260    Reach ID: T6.3-S2.01    Stream Name: Townsend Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 2  
  Reach Length / Percent 28 ft. 0.4 %  
  Impact Not Significant  
5.3 Bank Armoring Project Default
  Left Right  
  Length 47 ft. 0 ft.  
  Percent 0.7 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening Project Default
  Length / Percent 6,508 ft. 98.9 %  
  Impact High  
5.5 Dredging History Dredging Project Default
  Impact High