Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 120    Reach ID: R4-S5.02    Stream Name: Tigertown Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
5.1 Flow Regulation   Project Default
  Flow Regulation Type None  
  Flow Regulation Use  
  (Old) Flow Regulation  
  Impact Not Significant  
5.2 Bridges & Culverts Project Default
  Number 0  
  Reach Length / Percent ft. %  
  Impact Unknown  
5.3 Bank Armoring None Project Default
  Left Right  
  Length ft. ft.  
  Percent 0.0 %  
  Length (old) %  
  Impact Not Significant  
5.4 Channel Straightening None Project Default
  Length / Percent ft. 0.0 %  
  Impact Not Significant  
5.5 Dredging History None Project Default
  Impact Not Significant