Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 24    Reach ID: M20    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 69.0 %  
  Current Sub-Dominant Urban 7.0 %  
  Urban 7.0 %  
  Crop 2.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Wetland 80.0 ft.  
  Current Sub-Dominant Urban 13.0 ft.  
  Urban 13.0 %  
  Crop %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 0-25 0-25
  Length where less than 25 Feet 575 575 ft.
  Impact High  
4.4 Groundwater Inputs Abundant Project Default