Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 14    Reach ID: M15    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 78.0 %  
  Current Sub-Dominant Urban 4.0 %  
  Urban 4.0 %  
  Crop 3.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 61.0 ft.  
  Current Sub-Dominant Wetland 23.0 ft.  
  Urban 2.0 %  
  Crop 3.0 %  
  Impact Low  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 26-50 51-100
  Length where less than 25 Feet 0 2,011 ft.
  Impact Low  
4.4 Groundwater Inputs Abundant Project Default