Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 38    Reach ID: M6S3.02    Stream Name: Orcutt Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 61.0 %  
  Current Sub-Dominant Field 16.0 %  
  Urban 4.0 %  
  Crop 13.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 48.0 ft.  
  Current Sub-Dominant Urban 8.0 ft.  
  Urban 8.0 %  
  Crop 1.0 %  
  Impact Low  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 26-50 51-100
  Length where less than 25 Feet 0 0 ft.
  Impact Not Significant  
4.4 Groundwater Inputs Minimal Project Default