Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 78    Reach ID: T6.02    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 90.0 %  
  Current Sub-Dominant Urban 2.0 %  
  Urban 2.0 %  
  Crop 1.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 65.0 ft.  
  Current Sub-Dominant Urban 8.0 ft.  
  Urban 8.0 %  
  Crop %  
  Impact Low  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 51-100 0-25
  Length where less than 25 Feet 0 841 ft.
  Impact High  
4.4 Groundwater Inputs Minimal 1:24K topos, 1:5K NHD