Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

North Branch Winooski

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 35    Reach ID: T2.01    Stream Name: Minister Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Forest 84.0 %  
  Current Sub-Dominant Crop 3.0 %  
  Urban 2.0 %  
  Crop 3.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Crop 20.0 ft.  
  Current Sub-Dominant Urban 19.0 ft.  
  Urban 19.0 %  
  Crop 20.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 51-100 51-100
  Sub-dominant >100 >100
  Length where less than 25 Feet 650 843 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default