Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Third Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 143    Reach ID: T6.03    Stream Name: Flint Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 96.2 %  
  Current Sub-Dominant Urban 1.2 %  
  Urban 1.2 %  
  Crop 0.7 %  
  Impact Not Significant  
4.2 Corridor Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 38.3 ft.  
  Current Sub-Dominant Urban 22.9 ft.  
  Urban 22.9 %  
  Crop %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 26-50 51-100
  Length where less than 25 Feet 557 223 ft.
  Impact Low  
4.4 Groundwater Inputs Minimal Project Default