Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Third Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 7    Reach ID: M01-S3.02    Stream Name: M01-S3 - Camp Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 92.3 %  
  Current Sub-Dominant Urban 5.1 %  
  Urban 5.1 %  
  Crop 0.8 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 46.8 ft.  
  Current Sub-Dominant Urban 16.7 ft.  
  Urban 16.7 %  
  Crop 3.4 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 51-100 >100
  Sub-dominant >100 0-25
  Length where less than 25 Feet 2,073 845 ft.
  Impact Low  
4.4 Groundwater Inputs Minimal 1:5K NHD, NWI maps, field obs.