Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Missisquoi - Canada to Trout

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 28    Reach ID: R19T2.01    Stream Name: Stanhope Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Forest 93.1 %  
  Current Sub-Dominant Urban 1.3 %  
  Urban 1.3 %  
  Crop 0.9 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Urban 38.3 ft.  
  Current Sub-Dominant Forest 10.9 ft.  
  Urban 38.3 %  
  Crop 6.6 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 0-25
  Sub-dominant 51-100 >100
  Length where less than 25 Feet 209 1,399 ft.
  Impact High  
4.4 Groundwater Inputs None Project Default