Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Mettowee River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 42    Reach ID: M08    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Forest 81.9 %  
  Current Sub-Dominant Field 7.2 %  
  Urban 3.1 %  
  Crop 2.4 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Crop 29.6 ft.  
  Current Sub-Dominant Field 19.6 ft.  
  Urban 8.7 %  
  Crop 29.6 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 0-25 0-25
  Sub-dominant >100 26-50
  Length where less than 25 Feet 4,322 5,667 ft.
  Impact High  
4.4 Groundwater Inputs Minimal 1:5K NHD, NWI maps, field obs.