Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Mettowee River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 53    Reach ID: M11    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Forest 85.8 %  
  Current Sub-Dominant Field 5.5 %  
  Urban 1.8 %  
  Crop 1.4 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Not Evaluated Project Default
  Current Dominant Forest 48.4 ft.  
  Current Sub-Dominant Urban 9.3 ft.  
  Urban 9.3 %  
  Crop 1.7 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 26-50 51-100
  Length where less than 25 Feet 283 354 ft.
  Impact Low  
4.4 Groundwater Inputs Abundant Project Default