Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 8    Reach ID: M08    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest 1:5K orthos (1970s), old aerial photos, topos
  Current Dominant Forest 74.0 %  
  Current Sub-Dominant Urban 10.0 %  
  Urban 10.0 %  
  Crop 5.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Crop 1:5K orthos (1970s), old aerial photos, topos
  Current Dominant Urban 34.0 ft.  
  Current Sub-Dominant Forest 15.0 ft.  
  Urban 34.0 %  
  Crop 14.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 0-25 51-100
  Sub-dominant >100 >100
  Length where less than 25 Feet 2,283 232 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default