Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 9    Reach ID: T1.09    Stream Name: Joe's Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 79.0 %  
  Current Sub-Dominant Crop 5.0 %  
  Urban 3.0 %  
  Crop 5.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Field Project Default
  Current Dominant Urban 33.0 ft.  
  Current Sub-Dominant Forest 21.0 ft.  
  Urban 33.0 %  
  Crop 6.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 51-100
  Sub-dominant 51-100 0-25
  Length where less than 25 Feet 774 1,975 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default