Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 21    Reach ID: T2.08    Stream Name: Water Andric

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest 1:5K orthos (1970s)
  Current Dominant Forest 66.0 %  
  Current Sub-Dominant Crop 9.0 %  
  Urban 8.0 %  
  Crop 9.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Forest 1:5K orthos (1970s)
  Current Dominant Forest 36.0 ft.  
  Current Sub-Dominant Urban 27.0 ft.  
  Urban 27.0 %  
  Crop 0.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 51-100 51-100
  Sub-dominant 26-50 0-25
  Length where less than 25 Feet 376 605 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default