Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Dog River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 16    Reach ID: M07S2.02    Stream Name: Sub Trib 2 to reach 7 to the Dog River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 65.0 %  
  Current Sub-Dominant Crop 20.0 %  
  Urban 3.0 %  
  Crop 20.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Forest 60.0 ft.  
  Current Sub-Dominant Crop 23.0 ft.  
  Urban 11.0 %  
  Crop 23.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 51-100 51-100
  Sub-dominant >100 >100
  Length where less than 25 Feet ft.
  Impact No Data  
4.4 Groundwater Inputs None Project Default