Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West Branch Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 14    Reach ID: T3.S1.04    Stream Name: Calendar Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 76.0 %  
  Current Sub-Dominant Crop 7.0 %  
  Urban 4.0 %  
  Crop 7.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 31.0 ft.  
  Current Sub-Dominant Urban 23.0 ft.  
  Urban 23.0 %  
  Crop 5.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant 51-100 51-100
  Sub-dominant >100 >100
  Length where less than 25 Feet 0 237 ft.
  Impact Low  
4.4 Groundwater Inputs None Project Default