Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West Branch Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 22    Reach ID: T3.S3.01    Stream Name: Sutton River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Field Project Default
  Current Dominant Forest 80.0 %  
  Current Sub-Dominant Crop 5.0 %  
  Urban 5.0 %  
  Crop 5.0 %  
  Impact High  
4.2 Corridor Land Cover   Project Default
  Historic Project Default
  Current Dominant Urban 35.0 ft.  
  Current Sub-Dominant Forest 21.0 ft.  
  Urban 35.0 %  
  Crop 3.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 51-100
  Sub-dominant 51-100 0-25
  Length where less than 25 Feet 458 569 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default