Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Moose River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 3    Reach ID: M03    Stream Name: Moose River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Field Project Default
  Current Dominant Forest 88.0 %  
  Current Sub-Dominant Crop 2.0 %  
  Urban 2.0 %  
  Crop 2.0 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Field Project Default
  Current Dominant Urban 47.0 ft.  
  Current Sub-Dominant Forest 10.0 ft.  
  Urban 47.0 %  
  Crop 2.0 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 0-25
  Sub-dominant 26-50 None
  Length where less than 25 Feet 0 1,476 ft.
  Impact High  
4.4 Groundwater Inputs Minimal Project Default