Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Elmore Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 2    Reach ID: T02    Stream Name: Elmore Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 84.3 %  
  Current Sub-Dominant Urban 3.4 %  
  Urban 3.4 %  
  Crop 2.7 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 62.7 ft.  
  Current Sub-Dominant Urban 4.0 ft.  
  Urban 4.0 %  
  Crop 0.4 %  
  Impact Low  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 51-100 51-100
  Length where less than 25 Feet 0 0 ft.
  Impact Not Significant  
4.4 Groundwater Inputs Minimal Project Default