Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Second Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 108    Reach ID: T6.01    Stream Name: Unnamed Trib to the Second Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Data values Metadata
4.1 Watershed Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 88.1 %  
  Current Sub-Dominant Crop 3.9 %  
  Urban 2.3 %  
  Crop 3.9 %  
  Impact Low  
4.2 Corridor Land Cover   Project Default
  Historic Forest Project Default
  Current Dominant Forest 51.5 ft.  
  Current Sub-Dominant Urban 11.5 ft.  
  Urban 11.5 %  
  Crop 2.7 %  
  Impact High  
4.3 Riparian Buffer Width   Project Default
  Left Right  
  Dominant >100 >100
  Sub-dominant 0-25 26-50
  Length where less than 25 Feet 337 0 ft.
  Impact Not Significant  
4.4 Groundwater Inputs Minimal Project Default