Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 92    Reach ID: T6.01    Stream Name: Third Unnamed Tributary

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  Data values Metadata
3.1 Alluvial Fan None Project Default
3.2 Grade Control None Project Default
3.3 Geologic Materials  
  Dominant Till 48.0 %  
  Sub Dominant Ice-Contact 38.4 %  
3.4 Valley Side Slopes Left Right 1:24K topos
  Very Steep Steep  
3.5 Soil Properties     Project Default
  Hydrologic Group C 46.2 %  
  Flood Rating None/Rare 99.1 %  
  Water Table Deep 2.5 ft. 72.4 %  
  Water Table Shallow 1.0 ft. 44.6 %  
  Erodibility Severe ft. 58.6 %