Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 23    Reach ID: M19    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
2.1 Elevation Up/Down 1,170  /  1,150 ft. Project Default
2.2 Valley Length 3,914 ft. Project Default
2.3 Valley Slope 0.51 %  
2.4 Channel Length 5,138 ft. Project Default
2.5 Channel Slope 0.39 %  
2.6 Sinuosity 1.31  
2.7 Watershed Size 30.36 sq. mi.  
2.8 Channel Width 58.8 ft. Calculated
2.9 Valley Width 651 ft. Project Default
2.10 Confinement Ratio 11.07  
  Confinement Type Very Broad Calculated
2.11 Reference Stream Type C Project Default
  Mod. Ref. Stream Type  
  Subclass Slope c  
  Dominant Bed Form Dune-Ripple Project Default
  Dominant Bed Material Not Evaluated