Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 5    Reach ID: M07    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
2.1 Elevation Up/Down 980  /  960 ft. Project Default
2.2 Valley Length 3,336 ft. Project Default
2.3 Valley Slope 0.60 %  
2.4 Channel Length 4,998 ft. Project Default
2.5 Channel Slope 0.40 %  
2.6 Sinuosity 1.50  
2.7 Watershed Size 111.35 sq. mi.  
2.8 Channel Width 104.2 ft. Calculated
2.9 Valley Width 1,381 ft. Project Default
2.10 Confinement Ratio 13.25  
  Confinement Type Very Broad Project Default
2.11 Reference Stream Type C Project Default
  Mod. Ref. Stream Type  
  Subclass Slope c  
  Dominant Bed Form Dune-Ripple Field obs. along entire reach
  Dominant Bed Material Sand