Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Tyler Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 51    Reach ID: T2.01    Stream Name: Bouge Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
2.1 Elevation Up/Down 524  /  472 ft. Project Default
2.2 Valley Length 5,085 ft. Project Default
2.3 Valley Slope 1.02 %  
2.4 Channel Length 6,539 ft. Project Default
2.5 Channel Slope 0.80 %  
2.6 Sinuosity 1.29  
2.7 Watershed Size 12.09 sq. mi.  
2.8 Channel Width 39.2 ft. Calculated
2.9 Valley Width 252 ft. Project Default
2.10 Confinement Ratio 6.43  
  Confinement Type Broad Project Default
2.11 Reference Stream Type C Cross-sections, pebble counts
  Mod. Ref. Stream Type  
  Subclass Slope  
  Dominant Bed Form Riffle-Pool Field obs. along entire reach
  Dominant Bed Material Cobble