Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Mettowee River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 48    Reach ID: M09    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
2.1 Elevation Up/Down 840  /  780 ft. Project Default
2.2 Valley Length 5,999 ft. Project Default
2.3 Valley Slope 1.00 %  
2.4 Channel Length 6,609 ft. Project Default
2.5 Channel Slope 0.91 %  
2.6 Sinuosity 1.10  
2.7 Watershed Size 21.94 sq. mi.  
2.8 Channel Width 51.0 ft. Calculated
2.9 Valley Width 1,000 ft. 1:24K topos
2.10 Confinement Ratio 19.62  
  Confinement Type Very Broad Project Default
2.11 Reference Stream Type C Cross-sections, pebble counts
  Mod. Ref. Stream Type  
  Subclass Slope None  
  Dominant Bed Form Riffle-Pool Field obs. and detailed notes along entire reach
  Dominant Bed Material Gravel