Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 25    Reach ID: M1.10S1.01S1.01    Stream Name: Sub Sub Trib 1 to Reach 10 to Stevens Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
2.1 Elevation Up/Down 1,020  /  735 ft. 1:24K topos
2.2 Valley Length 5,084 ft. 1:24K topos
2.3 Valley Slope 5.61 %  
2.4 Channel Length 5,443 ft. SGAT automated
2.5 Channel Slope 5.24 %  
2.6 Sinuosity 1.07  
2.7 Watershed Size 0.61 sq. mi.  
2.8 Channel Width 10.6 ft. Calculated
2.9 Valley Width ft. 1:24K topos
2.10 Confinement Ratio 0.00  
  Confinement Type Semi-confined Field observation
2.11 Reference Stream Type B Field observation
  Mod. Ref. Stream Type  
  Subclass Slope a  
  Dominant Bed Form Step-Pool Preliminary estimate
  Dominant Bed Material Cobble