Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Winooski Mid, Alder to Montp

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 5    Reach ID: R07    Stream Name: Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  HUC 10 Winooski River -- Huntington River to mouth
  HUC 08 Winooski River
  Basin Winooski [08]
  Waterbody ID []
1.1 Reach Description This reach begins about 2.5 miles upstream of the dam in Essex Junction at a point where Route 117 abuts the stream (2 miles from the five corners intersection). The reach ends at the Route 89 and Route 2 bridges near the Richmond Interstate exit.
1.2 Towns Essex, Jericho, Richmond, Williston
1.3 Latitude  44.47882
  Longitude -73.06835
  Topo Maps ESSEX JUNCTION
  Ortho Maps 104216, 104220, 108212, 108216
  RecordStatus A
  UOE
  DOE
  UOC
  DOC
  ReachesRID 5599