Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Englesby Brook

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 1    Reach ID: M01    Stream Name: Engelsby Stream

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  HUC 10 Lake Champlain direct drainage -- Main Lake
  HUC 08 Lewis Creek, Little Otter, Lake Champlain
  Basin Northern Champlain [05]
  Waterbody ID Burlington Direct Land Drainage [VT05-10]
1.1 Reach Description Lowest portion of Engelsby Stream. Valley walls are well developed and stream is meandering in several channels. Numerous debris jams were observed.
1.2 Towns Burlington, South Burlington
1.3 Latitude  44.45822
  Longitude -73.22392
  Topo Maps 315.tif
  Ortho Maps 092216.sid 096216.sid
  RecordStatus A
  UOE
  DOE
  UOC
  DOC
  ReachesRID 2218