Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 244    Reach ID: T6.1-S3.01    Stream Name: Guernsey Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

  HUC 10 White River -- headwaters to Third Branch
  HUC 08 White River
  Basin White [09]
  Waterbody ID Middle White River Main Stem [VT09-02]
1.1 Reach Description Begins .25 mi S of intersection of Rt 100 and Liberty Hill Rd. Ends at intersection of Liberty Hill Rd and Forsha Rd.
1.2 Towns Pittsfield, Stockbridge
1.3 Latitude  43.77537
  Longitude -72.79788
  Topo Maps Bethel, Rochester, Mt Carmel, Chittenden, Pico Peak, Delectable Mountain, S Royalton, Woodstock N
  Ortho Maps
  RecordStatus A
  UOE
  DOE
  UOC
  DOC
  ReachesRID 670