Skip Navigation LinksHome > Table Data Changes

List Changes To The Record:
Project:Rock River   ReachID: M1S1.01
in Table: Reaches
 


Date Of ChangeUser Who ChangedField NameNew ValueOld Value
View10/26/2023 12:10:00 PMJoeBChannelWidth12.0000000000000
View10/25/2023 11:01:00 PMJoeBBedMaterialSandGravel
View10/25/2023 11:01:00 PMJoeBCommentsBeaver dam noted 11/04 near confluence with Rock River (B&C assessm). St. Armand Rd crossing: corrugated metal culvert replaced with larger box culvert between 8/15/04 and 10/6/04. Livestock in stream downstream of crossing (MRBA). Bed material (7.1). The reach was segment in Phase 2 to separate the reference E channel (lower) from the steep gorge at the top of the reach.Beaver dam noted 11/04 near confluence with Rock River (B&C assessm). St. Armand Rd crossing: corrugated metal culvert replaced with larger box culvert between 8/15/04 and 10/6/04. Livestock in stream downstream of crossing (MRBA). Bed material (7.1) f
View10/25/2023 5:46:00 PMJoeBSubclassSlopeNone
View10/25/2023 5:46:00 PMJoeBBedFormDune-RippleRiffle-Pool
View1/17/2023 12:45:00 PMJoeBSubclassSlope 
View12/1/2022 1:31:00 PMJoeBSubclassSlopec
View12/1/2022 1:31:00 PMJoeBConfinementTypeVB
View4/5/2022 1:16:00 PMJoeBReferenceStreamTypeEC
View4/5/2022 1:16:00 PMJoeBBedMaterialGravelSand
View4/5/2022 1:16:00 PMJoeBBedFormRiffle-PoolDune-Ripple