View | 10/27/2023 9:18:00 AM | JoeB | WatershedPastLandCover | Forest | F |
View | 10/23/2023 5:00:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/25/2023 3:08:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:25:00 PM | JoeB | IceJamPotential | Multiple | None |
View | 9/22/2023 4:25:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:24:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:23:00 PM | JoeB | DepositionalFeatures | Side | None |
View | 9/22/2023 4:23:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:23:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:23:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/22/2023 4:22:00 PM | JoeB | ValleyWidth | 100.0000000000000 | 98.0000000000000 |
View | 9/22/2023 4:22:00 PM | JoeB | WatershedPastLandCover | Forest | F |
View | 9/16/2019 4:26:00 PM | JoeB | Topos | Reach flowing southwest, with mix of forests and farmland adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand near midpoint. | Reach flowing southwest, with mix of forests and fields adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand at about midpoint. |
View | 9/16/2019 4:26:00 PM | JoeB | ReachDescription | Reach flowing southwest, with mix of forests and farmland adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand near midpoint. | Reach flowing southwest, with mix of forests and fields adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand at about midpoint. |
View | 9/16/2019 3:46:00 PM | JoeB | IceJamPotential | None | |
View | 9/16/2019 3:44:00 PM | JoeB | DepositionalFeatures | None | |
View | 9/16/2019 1:45:00 PM | JoeB | WaterbodyID | VT06-01 | |
View | 9/16/2019 1:45:00 PM | JoeB | Topos | Reach flowing southwest, with mix of forests and fields adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand at about midpoint. | |
View | 9/16/2019 1:45:00 PM | JoeB | ReachDescription | Reach flowing southwest, with mix of forests and fields adjacent to banks. Vegetated buffers are limited on edge of fields. Reach is straightened and crosses Chemin St Armand at about midpoint. | |
View | 9/16/2019 1:45:00 PM | JoeB | Orthos | | |
View | 9/16/2019 11:10:00 AM | JoeB | FlowRegulation | None | |
View | 9/12/2019 5:09:00 PM | JoeB | WatershedPastLandCover | Forest | |
View | 9/12/2019 5:09:00 PM | JoeB | GroundWaterInputs | Minimal | |
View | 9/12/2019 5:09:00 PM | JoeB | CorridorPastLandCover | Forest | |
View | 9/11/2019 3:03:00 PM | JoeB | ReferenceStreamType | C | |
View | 9/11/2019 3:03:00 PM | JoeB | BedMaterial | Gravel | |
View | 9/11/2019 3:03:00 PM | JoeB | BedForm | Riffle-Pool | |
View | 9/9/2019 10:47:00 AM | JoeB | ValleyWidth | 98.0000000000000 | |
View | 9/9/2019 10:47:00 AM | JoeB | ValleyLength | 4282.0000000000000 | |
View | 8/28/2019 10:30:00 AM | JoeB | MeanderWidth | 14.1000000000000 | |
View | 8/28/2019 10:30:00 AM | JoeB | MeanderWavelength | 14.1000000000000 | |
View | 7/31/2019 2:14:00 PM | JoeB | RightValleySlope | Extremely Steep | |
View | 7/31/2019 2:14:00 PM | JoeB | LeftValleySlope | Extremely Steep | |
View | 7/31/2019 10:20:00 AM | JoeB | SubclassSlope | None | |
View | 7/31/2019 10:20:00 AM | JoeB | ElevationUpstream | 253.3000000000000 | |
View | 7/31/2019 10:20:00 AM | JoeB | ElevationDownstream | 195.1000000000000 | |