View | 10/12/2023 2:42:00 PM | JoeB | BedForm | Plane Bed | Riffle-Pool |
View | 9/15/2023 12:14:00 PM | JoeB | Comments | Reach was split into 3 segments during Ph2. A is unconfined and very flat, B is confined and very flat ending at a large cascade. C is fully backwatered above the cascade. | Long flat run leading to a bedrock cascade starting at the bridge |
View | 9/15/2023 11:41:00 AM | JoeB | DepositionalFeatures | Multiple | None |
View | 12/9/2022 4:40:00 PM | JoeB | BedMaterial | Cobble | Gravel |
View | 3/30/2022 1:36:00 PM | JoeB | BedMaterial | Gravel | |
View | 3/30/2022 1:35:00 PM | JoeB | BedMaterial | | |
View | 3/30/2022 1:27:00 PM | JoeB | BedMaterial | | |
View | 3/30/2022 1:26:00 PM | JoeB | BedMaterial | | |
View | 3/24/2022 2:45:00 PM | JoeB | BedMaterial | | |
View | 3/24/2022 2:45:00 PM | JoeB | BedMaterial | | |
View | 3/23/2022 3:53:00 PM | JoeB | BedMaterial | | |
View | 3/23/2022 3:52:00 PM | JoeB | BedMaterial | | |
View | 3/23/2022 3:51:00 PM | JoeB | BedMaterial | | |
View | 3/16/2022 11:44:00 AM | JoeB | BedMaterial | | |
View | 3/16/2022 11:39:00 AM | JoeB | BedMaterial | | |
View | 3/16/2022 11:22:00 AM | JoeB | BedMaterial | | |
View | 3/16/2022 11:21:00 AM | JoeB | BedMaterial | | |
View | 9/16/2019 4:28:00 PM | JoeB | ReachDescription | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S near midpoint. | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. |
View | 9/16/2019 4:28:00 PM | JoeB | Topos | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S near midpoint. | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. |
View | 9/16/2019 3:57:00 PM | JoeB | Comments | Long flat run leading to a bedrock cascade starting at the bridge | |
View | 9/16/2019 3:57:00 PM | JoeB | IceJamPotential | Multiple | |
View | 9/16/2019 3:53:00 PM | JoeB | Topos | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. | Long reach flowing northwest with extensive forests adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. |
View | 9/16/2019 3:53:00 PM | JoeB | ReachDescription | Long reach flowing northwest with extensive forests and buffers adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. | Long reach flowing northwest with extensive forests adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. |
View | 9/16/2019 2:11:00 PM | JoeB | WaterbodyID | VT06-01 | |
View | 9/16/2019 2:11:00 PM | JoeB | Topos | Long reach flowing northwest with extensive forests adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. | |
View | 9/16/2019 2:11:00 PM | JoeB | ReachDescription | Long reach flowing northwest with extensive forests adjacent to banks. Farmland and some development is present further out but vegetated buffers are wide for the most part. Reach crosses Chemin Pelletier S at about midpoint. | |
View | 9/16/2019 2:11:00 PM | JoeB | Orthos | | |
View | 9/16/2019 11:08:00 AM | JoeB | MeanderWidth | | 111.0000000000000 |
View | 9/16/2019 11:08:00 AM | JoeB | MeanderWavelength | | 509.0000000000000 |
View | 9/16/2019 11:08:00 AM | JoeB | IsMeanderWidthNotApplicable | Y | N |
View | 9/16/2019 11:08:00 AM | JoeB | IsMeanderWaveLengthNotApplicable | Y | N |
View | 9/16/2019 11:08:00 AM | JoeB | DepositionalFeatures | None | |
View | 9/16/2019 10:13:00 AM | JoeB | FlowRegulation | None | |
View | 9/12/2019 4:22:00 PM | JoeB | WatershedPastLandCover | Forest | |
View | 9/12/2019 4:22:00 PM | JoeB | GroundWaterInputs | Minimal | |
View | 9/12/2019 4:22:00 PM | JoeB | CorridorPastLandCover | Forest | |
View | 9/12/2019 3:46:00 PM | JoeB | RightValleySlope | Extremely Steep | E |
View | 9/11/2019 2:25:00 PM | JoeB | SubclassSlope | c | None |
View | 9/11/2019 2:25:00 PM | JoeB | ReferenceStreamType | B | |
View | 9/11/2019 2:25:00 PM | JoeB | BedForm | Riffle-Pool | |
View | 9/9/2019 10:23:00 AM | JoeB | ValleyWidth | 204.0000000000000 | |
View | 9/9/2019 10:23:00 AM | JoeB | ValleyLength | 7134.0000000000000 | |
View | 8/28/2019 10:10:00 AM | JoeB | MeanderWavelength | 509.0000000000000 | |
View | 8/28/2019 10:10:00 AM | JoeB | MeanderWidth | 111.0000000000000 | |
View | 7/31/2019 11:44:00 AM | JoeB | RightValleySlope | Extremely Steep | |
View | 7/31/2019 11:44:00 AM | JoeB | LeftValleySlope | Extremely Steep | |
View | 7/31/2019 9:17:00 AM | JoeB | SubclassSlope | None | |
View | 7/31/2019 9:17:00 AM | JoeB | ElevationUpstream | 173.2000000000000 | |
View | 7/31/2019 9:17:00 AM | JoeB | ElevationDownstream | 136.8000000000000 | |