45 Projects. Click [View] for details.
| Project Number | Application Type | Applicant(s) | Landowner(s) | Project Addres | Description | Status | Town | Hearing Date | Decision Issued | Agenda Date | Comment/Petition due by |
|
2W0889-4
|
|
Chad Branon CWMA REALTY, LLC;
|
DANIEL EGAN DEPO LLC;
|
ROUTE 103
|
The project is generally described as the construction of a storage yard consisting of 30 parking/storage container spaces and a gate.
|
Withdrawn
|
Rockingham
|
|
Yes
|
07-14-2025
|
|
|
1R1027-A
|
Adm. Amend
|
Marble Village Housing Limited Partnership;
|
Marble Village Housing Limited Partnership;
|
430 Main Street
|
This permit specifically authorizes the following changes to the Marble Village Apartment
development authorized under Land Use Permit 1R1027: installation of sunshades to the
large windows on the southern exposure of the building, decking around the raised
garden beds, enlargement of the dumpster area, and construction of a maintenance/salt
shed. The project is located at 430 Main Street in West Rutland.
|
Permit
|
West Rutland
|
|
Yes
|
07-21-2025
|
|
|
4C0951-1
|
Adm. Amend
|
Clark W. Hinsdale;
|
|
839 One Mile Road
|
Subjecting land under Act 250 Jurisdiction to a conservation easement with the Vermont Land Trust.
|
Pending (Decision)
|
Charlotte
|
|
Yes
|
07-14-2025
|
|
|
4C0719-2D
|
Adm. Amend
|
Patricia Gilbert;
|
Patricia Gilbert;
|
345 Beatty Lane
|
This permit specifically authorizes the Permittee to construct a 3- bedroom single family residence and 1-bedroom attached accessory dwelling unit on Lot #4, rather than the previously approved 4-bedroom single family residence. In addition, this permit satisfies the requirement that the Permittee pay an application fee based on construction costs. These fees were not required with the issuance of Land Use Permit 4C0719-2B as it was envisioned that Ms. Gilbert would sell all of the lots and not construct any houses. The Project is located at 345 Beatty Lane in Richmond, Vermont.
|
Permit
|
Richmond
|
|
Yes
|
07-14-2025
|
|
|
4C0887-1R-S-2
|
Adm. Amend
|
Rieley Properties, LLC; The Snyder FC Commercial Properties, LLC;
|
Rieley Properties, LLC; The Snyder FC Commercial Properties. LLC;
|
27 Market Street
|
This permit specifically authorizes the Permittees to modify the primary and service entrances to the building approved in 4C0887-1R-2, including the addition of screened rooftop mechanical equipment, an exterior concrete patio, and reconfiguration of the steps and landscaping on the north side of the building.
|
Permit
|
Williston
|
|
Yes
|
07-07-2025
|
|
|
5W0489-4A
|
Adm. Amend
|
Melinda Neff E & E Holdings, LLC; Melinda Neff E & E Holdings, LLC;
|
Boutwell Masonic Building Association, Inc.;
|
288 Gallison Hill Road
|
2016 Change of Use from single use as Masonic Lodge to multiple use for 1) Masonic Lodge meeting place, 2) Green Mountain Behavior Consulting providing childhood counseling services, and 3) a bakery.
|
Permit
|
Montpelier
|
|
Yes
|
07-14-2025
|
|
|
5W1052-7
|
Adm. Amend
|
Blue Cross and Blue Shield of Vermont;
|
Blue Cross and Blue Shield of Vermont;
|
439 Industrial Lane, Berlin, VT
|
This permit specifically authorizes the reconfiguration of the existing “training” building on the BCBS campus into a daycare. Exterior construction is limited to the installation of two 4’ high chain-link fence enclosures (75’ x 50’ and 75’ x 30’) to create safe outdoor play areas for the children. The existing 20 parking spaces are sufficient. The project is located at 439 Industrial Lane in Berlin, Vermont.
|
Permit
|
Berlin
|
|
Yes
|
07-21-2025
|
|
|
6F0487-10
|
Adm. Amend
|
Morse Industrial Park Association;
|
B&T Properties LLC; Brett T & Brenda C & Robert C Macy; Georgia Self Storage LLC; K&L Ventures LLC; Northwest Vermont Solid Waste Management; Ten-Five 79 Investment Property LLC; Yin & Yang LLC;
|
Morse Drive
|
Construction of a stormwater improvement project, including a subsurface gravel wetland for stormwater treatment required under the 3-Acre rule.
|
Permit
|
Georgia
|
|
Yes
|
07-14-2025
|
|
|
JO 3-396
|
JO
|
|
Colleen and Dean Mul;
|
601 Tomahawk Trail
|
Located at 601 Tomahawk Trail, Newbury comprises two separate tracts of land, one of which was developed with a residential dwelling. In 2020, the owners of the Property (being Lots 1 and 2) secured a municipal zoning permit for the addition of a 2-car garage, porch, deck, and breezeway to the dwelling constructed on Lot 1. Said improvements were made to the dwelling, though no permission/approvals were found as it related to land use permit 3R0908.
Wastewater System and Potable Water Supply Permit No. WW-3-10012 was issued to George Huntington on 21 December 2007. The permit authorized the construction of a 3-bedroom home on Lot 2. No wastewater system, potable water supply, nor dwelling or any construction has occurred on Lot 2. It remains undeveloped. No Act 250 permit was obtained, and the Mulvilhills now plan to abandon WW-3-10012.
The questions, therefore, relate to whether the additions to the dwelling on Lot 1, and the issuance of a WW permit for Lot 2 require a permit amendment.
|
JO issued
|
Newbury
|
|
Yes
|
07-07-2025
|
|
|
JO 7-444
|
JO
|
|
|
I 91
|
Whether the VTrans Lyndon IM 091-3(53) culvert replacement project requires an Act 250 permit.
|
JO issued
|
Lyndon
|
|
Yes
|
07-21-2025
|
|
|
JO 8-313
|
JO
|
|
|
Upper Hollow Road, Lower Hollow Road, Town Road
|
This JO considers permit series 1B0037. The Dorset Hollow Corporation (DHC) proposes the following: sell lot D-5 and the construction of one single-family home; sell lots OH-5, 5A, and 6 and the construction one home single-family home on the lots; sell lots OH-3, P-4, B-8 and B-9 with development restrictions; sell or donate a river corridor easement over DHC remaining lands closest to the Mettawee River; and sell all remaining DHC lands (500+/- acres).
|
JO issued
|
Dorset
|
|
Yes
|
07-14-2025
|
|
|
JO 8-314
|
JO
|
|
|
|
Replacement of existing municipal water lines, referred to as Contract No. 2 and Contract No. 3.
|
JO issued
|
Dorset
|
|
Yes
|
07-14-2025
|
|
|
JO 9-102
|
JO
|
|
Phil Rosenzweig Middlebury Investors, LLC;
|
55 Middle Road
|
Construction of a new thirty-two (32) unit residential apartment building, including seven (7) affordable units, with a small commercial space (proposed restaurant) on the ground floor. Associated site improvements include: (1) upgrades to the existing access drive from Middle Road; (2) expanded parking with site lighting improvements; (3) a sidewalk connection to the existing sidewalk network; (4) municipal water and sanitary sewer connections; and (5) site grading, drainage, and stormwater management improvements. The project involves two distinct tracts of land that are ±0.81 acres and ±0.71-acres in size, respectively, for a total “project tract” of ±1.52 acres. The project tract falls entirely within the Town of Middlebury’s designated Neighborhood Development Area.
|
JO issued
|
Middlebury
|
|
Yes
|
07-14-2025
|
|
|
4C1110-1
|
Major
|
Essex Alliance Church;
|
c/o Merve Brown Allen Brook investments, LLP; Raymond & Judy Beaudry;
|
Rt. 2A
|
Partial findings under Criterion 9B for a proposed 11,000 sf worship center, children's center, youth center, gymnasium and offices.
|
Pending (Decision)
|
Williston
|
08-14-2008
|
Yes
|
07-14-2025
|
|
|
8B0344-9
|
Major
|
Joseph Genzano AWRE Vermont Resorts, LLC;
|
Thomas Dee SVHC Realty Inc.;
|
982 Mansion Dr, Bennington, VT 05201
|
The project is generally described as the redevelopment of the Southern Vermont College campus into a resort consisting of a hotel, chalets, and various amenities. This application is limited to requesting Partial Findings under Criterion 9(B) – Primary Agricultural Soils. This application is not seeking a permit to construct.
|
Findings
|
Bennington
|
05-01-2025
|
Yes
|
07-14-2025
|
|
|
9A0196-2
|
Minor
|
Eugenie Doyle; Samuel Burr;
|
Doyle-Burr Farm LLC;
|
Turkey Lane
|
This permit specifically authorizes construction of a ±2,000 square-foot residential duplex building, with two bedrooms per unit, on an undeveloped ±116-acre tract. The project will be served by an on-site shared wastewater disposal system and an on-site shared drilled well. The project is located off Turkey Lane in Monkton, Vermont, ±0.7 miles north of the intersection with Tyler Bridge Road.
|
Permit
|
Monkton
|
|
Yes
|
07-14-2025
|
07-07-2025
|
|
4C1308-1
|
Minor
|
Mark J. Letorney Rovers North, Inc.;
|
Andrea N. Letorney Andrea N. Letorney Revocable Trust; Andrea N. Letorney Mark J. Letorney Revocable Trust; Mark J. Letorney Andrea N. Letorney Revocable Trust; Mark J. Letorney Mark J. Letorney Revocable Trust;
|
1319 VT Route 128
|
Construction of a 70' x 115' shipping and receiving building with a break room and rest room, along with associated access/parking & utilities infrastructure. The proposed building will be served by an on-site mound wastewater disposal system and a non-transient non-community (NTNC) public water supply to allow for a total of 50 employees. The project is located at 1319 VT Route 128 in Westford, Vermont.
|
Permit
|
Westford
|
|
Yes
|
07-07-2025
|
02-28-2025
|
|
4C1349-2
|
Minor
|
Gary Bourne;
|
Gary Bourne 764 Shelburne Road, LLC;
|
760 Shelburne Rd
|
This permit specifically authorizes the construction of a 3,350 square feet financial institution on Lot 1 of the Bourne Planned Unit Development, on the former Shell Gas station lot at the corner of Shelburne Road and Swift Street (the “Project”). The Project is located at 760 Shelburne Rd in South Burlington, Vermont.
|
Permit
|
South Burlington
|
|
Yes
|
07-14-2025
|
06-24-2025
|
|
4C1358-1
|
Minor
|
Laurel Hill Apartments, LLC;
|
Laurel Hill Apartments;
|
4 Laurel Hill Drive
|
This application proposes a revision to the previously approved project by reallocating space initially designated for commercial use to create additional residential units. The original permit authorized a total of eleven (11) residential units, consisting of seven (7) 1-bedroom units and four (4) 2-bedroom units.
Under the proposed revision, the unit count will increase to thirteen (13), and the composition changes to ten (10) 1-bedroom units and three (3) 2-bedroom units.
|
Pending (Comment Period)
|
South Burlington
|
|
No
|
07-21-2025
|
08-06-2025
|
|
4C1363
|
Minor
|
Tom Sheppard Rivers Edge Building Development, LLC;
|
Tom Sheppard Rivers Edge Building Development, LLC;
|
13 Sweeney Farm Road
|
This project proposes construction of a 1,200 linear foot extension to Sweeney Farm Road and the creation of a subdivision called Hillside Meadows, consisting of 14 four-bedroom, single-family homes with conserved land, connection to municipal water and private septic systems. The project is located at 13 Sweeney Farm Road in Milton, Vermont.
|
Permit
|
Milton
|
|
Yes
|
07-07-2025
|
06-20-2025
|
|
5L0808-1
|
Minor
|
Gene Richards 1835, LLC and 2023, LLC.;
|
1835 LLC; 2023 LLC;
|
51 Lower Main Street East Rear
|
The project is generally described as the proposed change in use/renovation of the 5,325 square foot Old Mill/Warehouse Building into a 100-seat restaurant (2nd Floor) and five1-BR Apartment units on the 3rd floor. The first floor will become a common space for the restaurant above. The building’s exterior footprint will not be altered. The project is located on the Johnson Woolen Mill property at 51 Lower Main Street in Johnson, Vermont
|
Permit
|
Johnson
|
|
Yes
|
07-14-2025
|
07-08-2025
|
|
5L0923-4
|
Minor
|
Cynthia Whitham Ship Sevin II LLC;
|
Ship Sevin II LLC;
|
59 Katy Win West
|
This permit amendment specifically authorizes the construction of stormwater treatment practices at the Katy Win Mobile Home Park, including two non-infiltrating dry swales, two non-infiltrating subsurface sand filters, and associated stormwater conveyance facilities. The project is located off Katy Win Road in Johnson, Vermont.
|
Permit
|
Johnson
|
|
Yes
|
07-07-2025
|
06-11-2025
|
|
5W0286-10
|
Minor
|
Matt Clark Matt Clark's Northern Basement Systems;
|
Alelia Clark Clark Properties, LLC; Matt Clark Clark Properties, LLC;
|
348 Industrial Lane
|
The project is generally described as the development of a pre-existing 3.10 acres undeveloped lot in the Berlin Industrial Park located at 348 Industrial Lane with a 29,500 square foot building to serve as a warehouse/ garage/office space for the relocation of the Applicant’s existing basement/foundation care business. The project involves the construction of access drives, parking areas, loading areas, landscaping, site lighting, stormwater infrastructure systems, and the construction of a new 26 x 11 storage building. The project will be served by municipal water and wastewater connections.
|
Pending (Comment Period)
|
Berlin
|
|
Yes
|
07-21-2025
|
08-04-2025
|
|
2S0185-4A
|
Minor
|
Magris Talc USA, Inc.;
|
Magris Talc USA, Inc;
|
71 East Hill Rd
|
the replacement of two silos and the construction of a stair tower to access the tops of the silos (the “Project”).
|
Permit
|
Ludlow
|
|
Yes
|
07-21-2025
|
07-03-2025
|
|
2S1085-2
|
Minor
|
Ruby Iantosca c/o The Arborview Companies;
|
|
Raymond Rd.
|
authorizes the creation of Lot 9 and the construction of a single-family home on Lot 9 (the “Project”). No other lots or construction is approved.
|
Permit
|
Ludlow
|
|
Yes
|
07-14-2025
|
06-25-2025
|
|
1R0660-3
|
Minor
|
c/o Steve Durkee Mountainside Properties, Inc.; Laurie Waite Mountainside Development;
|
Mountainside Properties, Inc.;
|
0 Mountainside Drive
|
This Project (‘Mountainside Properties 2’ or “MSP2”) is located off Mountainside Drive in Killington, Vermont; it is contiguous to, and an extension of, MSP1 and will be served by the extension of Mountainside Drive. The Project will also be served by the existing, permitted Highridge ski-in/ski-out trail. The Project is subject to permits 1R0468-15 and 1R0660.
The Applicant seeks authorization to subdivide a +/-62-acre parcel of land into 20 lots, and to complete the site work and construction of common infrastructure on lots 1-14 and Common Areas A, B, and C of the subdivision, to include: a 1,400’± extension of Mountainside Drive to serve lots 1-5, 12, 13; a new 2,070’± roadway known as Songbird Lane to serve lots 6-11 and 14; a fire pond; construction of two new/additional ski trail segments providing access to lots 9-11 and 14; one ski trail tunnel (under Songbird Lane); a ski bridge for the existing Fall Line Ski Trail to cross over Songbird Lane; and related infrastructure/utilities, including underground electric and communication lines, stormwater drainage, and wastewater pre-treatment (to be provided by KPSRP via connection to the existing Mountainside wastewater collection system, Alpine Pipeline, and the Rutland municipal wastewater treatment plant). The clearing and acreage of earth disturbance from subsequent construction of site work and common infrastructure is proposed to be timed and phased.
The ‘remaining acreage’ consists of 4 designated Common Areas A through D (24.88 acres; unimproved excepting the two private roadways, utilities, and new ski trails on A, B, and C); and 2 designated Reserved Areas (13.28 acres; unimproved). Neither construction of improvements on the Common and Reserved Areas nor the construction of any residences is proposed at this time, and will be subject to future permit amendments.
|
Pending (Comment Period)
|
Killington
|
|
No
|
07-21-2025
|
08-04-2025
|
|
1R0712-21
|
Minor
|
Elwin Jackson Ultravation, Inc.; Rutland County Humane Society; Town of Brandon;
|
Town of Brandon; Ultravation, Inc.;
|
218 Jones Drive
|
The project is generally described as the change of use of an existing light industrial use building (located on Lot 15) to a humane society. Specifically, the project proposes the interior renovation of the main brick building, removal of two existing loading docks, installation of a new main entrance, removal of asphalt from the existing parking area, regrading of existing gravel parking lot, construction of a fenced-in dog play yard, installation of solar panels, and a 0.42-acre boundary line adjustment.
|
Pending (Comment Period)
|
Brandon
|
|
No
|
07-21-2025
|
08-05-2025
|
|
2W0929-3
|
Minor
|
Lyssa Papazian Landmark Trust USA;
|
LANDMARK TRUST INC (USA);
|
481 Kipling Road
|
the conversion of the loft of an existing historic stable on the 29.3 acre Naulakha Property at 481 Kipling Rd into a studio-sized short term vacation rental unit and installation of onsite water and wastewater systems.
|
Permit
|
Dummerston
|
|
Yes
|
07-21-2025
|
07-03-2025
|
|
4C0122-12
|
Minor
|
Green Mountain Habitat for Humanity;
|
Green Mountain Habitat for Humanity;
|
72 Temple St.
|
Construction of a duplex residence on previously approved Lot 83 of Ethan Allen Farms development. The project is located at 72 Temple Street in Burlington, Vermont.
|
Pending (Comment Period)
|
Burlington
|
|
No
|
07-14-2025
|
07-31-2025
|
|
4C0519-4
|
Minor
|
Amy Cooper; Taylor Harmeling;
|
Amy Cooper; Taylor Harmeling;
|
3702 Mt. Philo Road
|
A boundary line adjustment between non-jurisdictional Lot 1 and jurisdictional Lot 12 (Waller subdivision), along with approval of an on-site water supply and wastewater disposal system for Lot 12 (the “Project”). The project is located at 3702 Mt. Philo Road in Charlotte, Vermont.
|
Pending (Comment Period)
|
Charlotte
|
|
No
|
07-21-2025
|
08-06-2025
|
|
4C0528-11A-1
|
Minor
|
Catamount-Malone/Hinesburg, LLC;
|
Catamount-Malone/Hinesburg, LLC;
|
10516 Route 116
|
The facility at 10516 Route 116 in Hinesburg, VT previously utilized three open lagoons to the west of the main facility for processing and treatment of concentrated cheese waste. One lagoon has been filled and two lagoons have been remediated to remove all hazardous waste that was remaining from previous wastewater operations. The two remaining open lagoons are surrounded with naturally established wetland vegetation. A Tier 2 gravel wetland retrofit is proposed in place of the southwestern lagoon. Stormwater runoff will be redirected to the gravel wetland retrofit via a grass swale and new storm pipe. A diversion structure will direct runoff from the 1” storm into the gravel wetland while allowing larger storms to continue and discharge directly into the LaPlatte River.
|
Pending (Comment Period)
|
Hinesburg
|
|
No
|
07-21-2025
|
08-06-2025
|
|
4C0610-4B
|
Minor
|
Daniel & Brooke White WHITE DANIEL & WHITE BROOKE JOINT TRUST;
|
Daniel & Brooke White WHITE DANIEL & WHITE BROOKE JOINT TRUST; Kevin & Claire Mahoney;
|
67 Bear Creek Road
|
This permit specifically authorizes the creation of a revised building envelope to house the after-the-fact construction of an in-ground pool, patio area, and a small shed behind the existing home at 67 Bear Creek Road. The project includes a boundary line adjustment/exchange of 0.044 acres with the abutting southern property at 314 Wortheim Lane to meet local setback requirements. The project is located at 67 Bear Creek Road and 314 Wortheim Lane in Richmond, Vermont.
|
Pending (Comment Period)
|
Richmond
|
|
No
|
07-14-2025
|
07-24-2025
|
|
6F0657-1
|
Minor
|
Chip Sawyer City of Saint Albans;
|
Chip Sawyer City of St. Albans;
|
See Exhibits #004 and 006.
|
“Phase II” of the Federal Street Multimodal Connector Project, which includes: (1) reconstruction of the Federal Street corridor; (2) construction of a new ±800-foot roadway section that will extend the St. Albans State Highway through South Main Street to the Nason Street-Lemnah Drive intersection ("Nason Street Connector"); and (3) redevelopment and/or improvement of other existing roads within St. Albans City.
Project details include: (a) grading, curbing, sidewalk, subbase, and pavement installation on new horizontal and vertical alignments; (b) rehabilitation, overlay, and widening of existing streets; (c) new drainage infrastructure; (d) new traffic signals, street lighting, rail crossings, signs, road striping, and landscaping; and (e) installation of a new box culvert carrying Lemnah Drive over Stevens Brook.
|
Pending (Comment Period)
|
Saint Albans City
|
|
No
|
07-14-2025
|
07-31-2025
|
|
700013-3
|
Minor
|
Vernon Advent Christian Home, Inc;
|
Vernon Advent Christian Home, Inc.;
|
61 Greenway Dr Vernon, VT 05354
|
The project will consist of constructing one, three story building for skilled nursing care, which will replace the existing nursing home facility. The project will also construct an addition to Vernon Hall for support services and a storage building off Stebbins Rd. The proposed development will create new parking, sidewalks, plantings, and utilities. The majority of development is expected to take place between the existing nursing homes and Vernon Hall. Utility development will extend behind the existing independent house buildings.
|
Permit
|
Vernon
|
|
Yes
|
07-14-2025
|
03-04-2025
|
|
7C1417
|
Minor
|
|
Ali Ide Friends of Dog Mountain;
|
143 Parks Road
|
Recreation trail improvements (2 to 6 feet wide within a 4 to 8 feet corridor) at the Dog Mountain property. The project includes new boardwalks and bridges along wet areas and a wetland permit.
|
Permit
|
Saint Johnsbury
|
|
Yes
|
07-14-2025
|
08-12-2024
|
|
7R0410-3
|
Minor
|
GMS Realty, LLP;
|
GMS Realty, LLP;
|
5452 Route 5
|
This permit amendment is intended to account for additional impervious surfaces added to the site subsequent to approval of General Permit 3183-9010.R. Approximately 14.300 square feet of impervious surface was added after the permit was issued, and an additional 9,100 sf of impervious surface is proposed to be added in the spring of 2025. Both a town zoning permit and a stormwater permit amendment are concurrent with the submittal of this Act 250 permit amendment.
|
Pending (Comment Period)
|
Derby
|
|
No
|
07-14-2025
|
07-31-2025
|
|
8B0059-2
|
Minor
|
1934Plymouth, Inc.;
|
1934PLYMOUTH, INC.;
|
5403 VT Route 7A
|
Application 8B0059-2 from 1934Plymouth, Inc., 5403 VT Rt. 7A, Arlington, VT 05250, was
received on December 6, 2024, and deemed complete on June 23, 2025. The Applicant seeks
after-the-fact approval for the following site improvements: the construction of a beer
garden/patio and use of a 20-foot by 40-foot tent for seasonal outdoor restaurant service and
live music events; installation of additional lighting and signage; relocation and screening of the
dumpsters; and installation of tiny homes and storage shed on the foundation of the previous
mobile home and perimeter fence. The project also includes implementation of a wetland
mitigation plan.
The Project is located at 5403 VT Route 7A in Arlington, Vermont (SPAN: 015-005-10560).
|
Pending (Comment Period)
|
Arlington
|
|
No
|
07-07-2025
|
07-22-2025
|
|
5W1111-5
|
Minor
|
Sugarbush Mountain Resort Inc.;
|
John Hammond Sugarbush Mountain Resort Inc.;
|
121 Gatehouse Lane, Warren, VT 05674
|
This permit specifically authorizes the “Clay Brook Flow Augmentation System”, required by Department of Environmental Conservation, which is proposed to restore stream flows in Clay Brook by utilizing water from Sugarbush's snowmaking system to provide water to Clay Brook when the drinking water withdrawal is operating, and Clay Brook flows are at or below seasonal conservation flows. The proposed system will be automated and will use input from the drinking water plant to determine the flow of Clay Brook and when withdrawal of water is needed. The design will use a nearby snowmaking valve house and involves the construction of a 70-foot long, 12 foot-wide, 2-feet deep flow equalization channel lined with 12-inch thick VAOT Type I stone fill. When the flow augmentation system is operating a six-inch diameter pipe will transport water from the snowmaking system to through the channel to an existing culvert at the end of the channel that will release water to Clay Brook. The project is located at 121 Gatehouse Lane, Warren, Vermont.
|
Permit
|
Warren
|
|
Yes
|
07-07-2025
|
07-01-2025
|
|
5W1402-3B
|
Minor
|
Capital Soccer Club; Ice Center of Washington West; Town of Waterbury;
|
Town of Waterbury;
|
0 River Road
|
Proposed expansion of an existing recreation field situated on an upper terrace adjacent to the previously permitted ice center building located at 0 River Road in Waterbury. The 40 acres tract includes the ice center building, parking area and several grassed community playing fields. The project involves grading to increase the field to 150’ wide x 230’ long. The field will be seeded with grass once grading is completed. No new structures are proposed.
|
Pending (Comment Period)
|
Waterbury
|
|
No
|
07-07-2025
|
07-28-2025
|
|
5W1627
|
Minor
|
John and Pam Benoit Benoit Properties, Inc.;
|
Benoit Properties, Inc.;
|
241 School Road
|
This permit specifically authorizes the as-built conversion of an existing, two-level barn into a wedding/event venue occupying 2 acres of a 52 acres tract located at 241 School Road in Barre Town. The improvements involved the installation of insulation in the walls, HVAC, new windows and doors, a new black standing seam roof and new white exterior paint. There are dedicated spaces for food /catering trucks and portalets on the westerly side of the barn. The existing gravel parking area was expanded to 46 spaces, with an additional 24 spaces in an adjacent grassed area. The driveway will utilize an existing curb cut off School Road.
|
Permit
|
Barre Town
|
|
Yes
|
07-21-2025
|
07-14-2025
|
|
6F0247-C
|
Minor
|
Jose Martinez Trinity Presbyterian Church;
|
Trinity Presbyterian Church;
|
350 South Main St.
|
Construction of a ±6,435 square-foot, ±20-space expansion of the existing church parking lot and addition of a drop-off lane and improved handicap parking spots upon a previously approved ±4.3-acre parcel. The parking lot expansion will consist of a gravel surface and the project also includes new internal sidewalk construction and replacement of existing internal sidewalk, as well as a small portion of new pavement in the existing parking area.
|
Pending (Comment Period)
|
Saint Albans Town
|
|
No
|
07-07-2025
|
07-24-2025
|
|
6F0357R-8-1
|
Minor
|
Owen Manahan DGUSA REALTY LLP;
|
DGUSA REALTY LLP;
|
90 Parah Drive
|
This permit specifically authorizes construction of a ±28-foot-tall hoop barn storage facility. The hoop barn will be located adjacent to the existing manufacturing facility and will be surrounded by outdoor asphalt storage areas and loading areas. The Project also includes installation of a movable loading dock and construction of a stormwater treatment system. No changes to daily operations and no new employees are proposed or authorized. The project is located at 90 Parah Drive in St. Albans Town, Vermont.
|
Permit
|
Saint Albans Town
|
|
Yes
|
07-07-2025
|
05-15-2023
|
|
4C0930
|
Minor
|
James Bean; William Sawyer;
|
James Bean;
|
|
3 lot residential subdivision on Lake Road
|
Pending (Decision)
|
Milton
|
|
Yes
|
07-14-2025
|
|
|
4C0816-6
|
Minor
|
Nina Goldman;
|
Glenn Goldman; Nina Goldman;
|
21 Saxon Hill Road
|
This permit specifically authorizes the construction of a 4-bedroom single-family residence and a proposed 1-bedroom accessory dwelling unit, along with after-the-fact demolition of a single-family residence. The project includes the change in use of an existing barn which will become an event space with a maximum capacity of 40 attendees. The three structures will be served by municipal water and on-site septic. The project is located at 21 Saxon Hill Road in Essex, Vermont.
|
Pending (Comment Period)
|
Essex, Town of
|
|
No
|
07-21-2025
|
08-04-2025
|
|
4C0881-5
|
Minor
|
WGM Associates;
|
WGM Associates;
|
896 Hinesburg Road
|
The project is generally described as Create a 9-Lot Subdivision (including Open Space and ROW parcels) on the 10.05 acre property and further detailed as: (a) subdivision of a 10.05-acre tract of land into 8 lots and one right-of-way parcel; (b) construction of infrastructure common to this subdivision, including a road, utilities, and common improvements on Lot 4; and (c) authorization for use of an existing trucking business on Lot 1B. The project is located at 896 Hinesburg Road in South Burlington, Vermont.
|
Pending (Comment Period)
|
South Burlington
|
|
No
|
07-07-2025
|
07-22-2025
|