Funded Projects

What has been Reported
When was it Reported
  IDProject NamePartnerCountiesBasin PlanProject TypeStatusAmount
1St. Johnsbury Stormwater Master PlanningCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater Master PlanningCompleted$38,100.00
4Taylor Street Redevelopment - Green Stormwater Infrastructure and Green SpaceMontpelier CityWashingtonWinooskiStormwater - ImplementationFunded and in Progress$230,000.00
5Taylor Street Redevelopment - Green Stormwater InfrastructureMontpelier CityWashingtonWinooskiStormwater - ImplementationFunded and in Progress$250,000.00
7Towle Neigborhood Road Erosion Control - Planning and DesignFranklin Watershed CommitteeFranklinMissisquoi BayRoad Project - Final DesignCompleted$6,600.00
9Erosion Reduction at Hayes Road Stream CrossingFriends of the Winooski RiverWashingtonWinooskiFloodplain/Stream Restoration - ImplementationCompleted$25,000.00
10Alburgh Stormwater Mitigation and Road Erosion Control DesignsLamoille County Conservation DistrictGrand IsleNorth ChamplainStormwater - Preliminary Design $1,350.00
11Preparing Local Watersheds for Flood Resilience and Reducing Runoff in Lewis CreekLewis Creek AssociationChittendenOtter CreekStormwater - Preliminary DesignCompleted$67,254.00
12Whitney Brook and Black River Riparian Buffer RestorationOrleans County Natural Resources Conservation DistrictOrleansMemphremagogRiver - PlantingCompleted$12,724.00
13Lake Bomoseen Stormwater Master PlanningPoultney-Mettowee Natural Resources Conservation DistrictRutlandSouth ChamplainStormwater Master PlanningCompleted$24,430.00
14Shelburne Bay/Nesti Lane, Shelburne and South Burlington Stormwater Treatment Shelburne TownChittendenNorth ChamplainStormwater - ImplementationFunded and in Progress$219,200.00
15Constructing Green Stormwater Infrastructure at the Waitsfield Town Office Waitsfield TownWashingtonWinooskiStormwater - ImplementationCompleted$15,000.00
17Williston Town Fields Stormwater Treatment SystemWilliston TownChittendenWinooskiStormwater - Preliminary DesignFunded and in Progress$8,911.55
18Kedron Brook Agricultural Nutrient Management Planning and Flood ResiliencyTwo Rivers-Ottauquechee Regional CommissionWindsorBlack and OttauquecheeAgricultural Pollution Prevention - IdentificationCompleted$23,418.00
19Enhancing Nutrient Management Plan Implementation with GoCrop SoftwareUniversity of Vermont ExtensionFranklinNorth Champlain, Missisquoi BayAgricultural Pollution Prevention - EquipmentCompleted$57,577.00
20Precision Manure Application Equipment in the Jewett Brook WatershedUniversity of Vermont ExtensionFranklinNorth ChamplainAgricultural Pollution Prevention - EquipmentCompleted$74,014.89
21Reduction of Fall Tillage in Jewett and Stevens Brook WatershedsUniversity of Vermont ExtensionFranklinNorth ChamplainAgricultural Pollution Prevention - EquipmentFunded and in Progress$102,154.00
22Agricultural Best Management Practice Planning - South Lake Champlain Vermont Association of Conservation DistrictsAddison, Bennington, RutlandSouth ChamplainAgricultural Pollution Prevention - IdentificationCompleted$150,000.00
23Statewide Trees for Streams/Riparian Buffer Restoration, 2016Vermont Association of Conservation DistrictsStatewide River - PlantingFunded and in Progress$173,250.00
24Moulton River Corridor EasementVermont Land TrustOrleansMissisquoi BayRiver Corridor Easement - ImplementationCompleted$68,102.68
25Nulhegan River Confluence EasementsVermont River ConservancyEssexNorthern ConnecticutRiver Corridor Easement - ImplementationCompleted$9,500.00
26Rankin Farm River Corridor EasementVermont Land TrustLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$39,513.00
27Rogers Farm River Corridor EasementVermont Land TrustWashingtonWinooskiRiver Corridor Easement - ImplementationCompleted$85,309.00
28Lower White River Bank Restoration DesignWhite River PartnershipWindsorWhiteFloodplain/Stream Restoration - Preliminary DesignCompleted$8,675.00
29Whetstone Brook Corridor Easement PlanningWindham County Natural Resources Conservation DistrictWindhamDeerfieldRiver Corridor Easement - DesignCompleted$6,000.00
30Absorbing the Storm at Rumney Memorial School - ConstructionWinooski Natural Resources Conservation DistrictWashingtonWinooskiStormwater - ImplementationCompleted$97,750.00
31Stormwater Master Planning for the Town of MiddleburyAddison County Regional Planning CommissionAddisonOtter CreekStormwater Master PlanningCompleted$22,750.00
32Crosby Farms Stormwater Treatment Pond Retrofit and Infiltration DesignLake Champlain CommitteeAddisonOtter CreekStormwater - Final DesignCompleted$10,430.00
33Upper White River Corridor Restoration ProjectWhite River PartnershipAddisonWhiteRiver Corridor Easement - ImplementationCompleted$54,113.00
34Bennington Infrastructure Stormwater Mapping Project Watershed ConsultingBenningtonBatten Kill, Walloomsac and HoosicStormwater - IDDECompleted$32,990.00
35Bennington and Pawlet Illicit Discharge Detection and EliminationWatershed ConsultingBennington, RutlandBatten Kill, Walloomsac and Hoosic, South ChamplainStormwater - IDDECompleted$51,192.00
36Water Andric Stream Restoration Design (Lower Passumpsic Watershed)Caledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicFloodplain/Stream Restoration - Preliminary DesignCompleted$13,640.00
37Dishmill Brook Watershed Stormwater Master PlanningCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater Master PlanningCompleted$32,730.00
38Upper Wells River Phase 2 Stream Geomorphic Assessment and Project DevelopmentConnecticut River ConservancyCaledonia, OrangeStevens, Wells, Waits and OmpompanoosacStream Geomorphic Assessment Phase 2Completed$67,798.00
39Western Avenue, St. Johnsbury Stormwater Treatment DesignCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater - Final DesignCompleted$14,829.00
40Lake Shoreland and River Buffer Restoration in the Memphremagog BasinNorthWoods Stewardship CenterEssex, OrleansMemphremagogLake Shoreland - ImplementationCompleted$3,092.00
41NorthWoods Conservation Corps Watershed Crew, 2015NorthWoods Stewardship CenterCaledoniaPassumpsicRoad Project - ImplementationCompleted$14,290.00
42Colchester High School Stormwater Treatment DesignWinooski Natural Resources Conservation DistrictChittendenNorth ChamplainStormwater - Final DesignCompleted$18,840.00
43Lake Iroquois Public Beach Erosion Control and Stormwater TreatmentLake Iroquois Recreation DistrictChittendenNorth ChamplainStormwater - ImplementationCompleted$49,661.00
44The Upper La Platte River Natural Area Floodplain & River Restoration ProjectLake Champlain Land TrustChittendenNorth ChamplainRiver - PlantingCompleted$15,750.00
45Birds of Vermont Museum, Huntington Stream Restoration and Gully RemediationBirds of Vermont MuseumChittendenWinooskiFloodplain/Stream Restoration - ImplementationCompleted$11,000.00
46Crooked Creek Gully Restoration DesignsFitzgerald Environmental AssociatesChittendenNorth ChamplainFloodplain/Stream Restoration - Final DesignCompleted$13,000.00
47Installation of Pervious Sidewalk to Increase Infiltration and Reduce Stormwater RunoffBurlington CityChittendenNorth ChamplainStormwater - ImplementationCompleted$11,890.00
48Town of Brighton Stormwater Management Retrofit Planning and DesignEssex County Natural Resources Conservation DistrictEssexMemphremagogStormwater - Final DesignCompleted$17,350.00
49Merck Parcel River Corridor Easement, Nulhegan RiverVermont River ConservancyEssexNorthern ConnecticutRiver Corridor Easement - ImplementationCompleted$51,736.00
53Agricultural Conservation Practice Identification in Critical Source Areas of Hungerford BrookFriends of Northern Lake ChamplainFranklinMissisquoi BayAgricultural Pollution Prevention - IdentificationCompleted$35,000.00
55Erosion Reduction along Shenang RoadFairfield TownFranklinMissisquoi BayRoad Project - ImplementationCompleted$30,000.00
56Marble Mill Park Underground Stormwater Treatment: Final Design and Implementation of Phase 1Swanton VillageFranklinMissisquoi BayStormwater - ImplementationCompleted$74,880.00
58Hyde Park Stormwater Improvement ProjectLamoille County Conservation DistrictLamoilleLamoilleStormwater - ImplementationCompleted$75,000.00
59Selawsky River Corridor Easement Design on the Wild BranchVermont River ConservancyLamoilleLamoilleRiver Corridor Easement - DesignCompleted$11,500.00
60Selawsky River Corridor Easement: Wild Branch - Phase 2Vermont River ConservancyLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$26,540.00
62Ompompanoosuc River Corridor Easements - Dresser Farm and Odd Dog FarmUpper Valley Land TrustOrangeStevens, Wells, Waits and OmpompanoosacRiver Corridor Easement - ImplementationCompleted$84,597.00
63No-Till: Improving Water Quality & Soil Health With Reduced Tillage, Cover Cropping, InterseedingWhite River Natural Resources Conservation DistrictOrange, WindsorWhite, Stevens, Wells, Waits and OmpompanoosacAgricultural Pollution Prevention - EquipmentCompleted$34,550.00
64Stormwater Treatment Study for the Memphremagog WatershedMemphremagog Watershed AssociationOrleansMemphremagogStormwater - Preliminary DesignCompleted$20,000.00
65Memphamagog Illicit Discharge Detection and Elimination CompletionStone EnvironmentalOrleansMemphremagogStormwater - IDDECompleted$9,040.00
66Upper and Middle Connecticut River and Pasumpsic River Illicit Discharge Detection and EliminationStone EnvironmentalCaledonia, Connecticut River Basin, Essex, Orange, Orleans, WindsorStevens, Wells, Waits and Ompompanoosac, Passumpsic, Northern ConnecticutStormwater - IDDECompleted$58,100.00
67Precision Manure Application Technology to Minimize Nutrient Loss/PollutionUniversity of VermontLake Champlain Basin Agricultural Pollution Prevention - EquipmentCompleted$75,057.00
68Equine Manure Runoff Management ProgramWinooski Natural Resources Conservation DistrictChittenden, Grand IsleNorth Champlain, Lamoille, WinooskiAgricultural Pollution Prevention - ImplementationCompleted$13,000.00
69Project Prioritization and Design for Implementation of the Cold River Corridor PlanFitzgerald Environmental AssociatesRutlandOtter CreekFloodplain/Stream Restoration - Preliminary DesignCompleted$10,000.00
70Middletown Springs Stormwater Runoff Mitigation through Green Stormwater InfrastructureMiddletown Springs Fire AssociationRutlandSouth ChamplainStormwater - Final DesignCompleted$10,580.00
71Flower Brook Watershed Stormwater Master Planning in the Town of PawletPoultney-Mettowee Natural Resources Conservation DistrictRutlandSouth ChamplainStormwater Master PlanningCompleted$38,610.00
73Poultney and Mettowee Rivers Agricultural Conservation Practice ImplementationPoultney-Mettowee Natural Resources Conservation DistrictRutlandSouth ChamplainAgricultural Pollution Prevention - ImplementationCompleted$74,010.00
75Flood Mitigation Project Identification and Design along the Dog River in the Town of NorthfieldFriends of the Winooski RiverWashingtonWinooskiFloodplain/Stream Restoration - Preliminary DesignCompleted$37,570.00
76Development of a Stormwater Master Plan for the City of MontpelierMontpelier CityWashingtonWinooskiStormwater Master PlanningCompleted$39,984.23
77Cabot School Stormwater Mitigation - DesignFriends of the Winooski RiverWashingtonWinooskiStormwater - Final DesignCompleted$8,881.00
78Pouliot Avenue Stormwater Mitigation StudyFriends of the Winooski RiverWashingtonWinooskiStormwater - Final DesignCompleted$17,147.00
79Harwood Union Middle School and High School Stormwater Treatment DesignFriends of the Mad RiverWashingtonWinooskiStormwater - Final DesignCompleted$29,810.00
80Barre Neighborhood Stormwater Management PlanFriends of the Winooski RiverWashingtonWinooskiStormwater Master PlanningCompleted$11,470.00
81Rumney Memorial School Stormwater Mitigation DesignWinooski Natural Resources Conservation DistrictWashingtonWinooskiStormwater - Preliminary DesignCompleted$8,130.00
82Winooski Trees for Streams/Riparian Buffer Restoration, 2015Winooski Natural Resources Conservation DistrictChittenden, WashingtonOtter Creek, WinooskiRiver - PlantingCompleted 
83Northfield Stormwater Mitigation Site Construction (Central Street and Main Street)Central Vermont Regional Planning CommissionWashingtonWinooskiStormwater - ImplementationCompleted$59,842.00
84Pinney Hollow Brook Floodplain and Streambed Restoration DesignTwo Rivers-Ottauquechee Regional CommissionWindsorBlack and OttauquecheeFloodplain/Stream Restoration - Final DesignCompleted$21,200.00
85Projects to Address Sediment Sources in the Upper Black River WatershedLake Rescue AssociationWindsorBlack and OttauquecheeFloodplain/Stream Restoration - ImplementationCompleted$27,395.00
87Implementation of Road Erosion Controls along Class IV RoadsVermont Youth Conservation CorpsAddison, Chittenden, Lamoille, Rutland, Washington, WindsorLamoille, Winooski, WhiteRoad Project - ImplementationCompleted$75,000.00
93Hardwick Stormwater Master PlanCaledonia County Natural Resources Conservation DistrictCaledoniaLamoilleStormwater Master PlanningCompleted$24,700.00
100Second Branch White River Corridor Easement (Wortman Farm) Vermont Land TrustOrangeWhiteRiver Corridor Easement - ImplementationCompleted$32,962.72
127Jericho Stormwater Master PlanChittenden County Regional Planning CommissionChittendenLamoille, WinooskiStormwater Master PlanningCompleted$19,000.00
128Quarry Hill and Sterling Hill Stormwater Master PlanningFriends of the Winooski RiverWashingtonWinooskiStormwater Master PlanningCompleted$19,490.00
129North River Stream Geomorphic Assessment and Corridor Planning for Project IdentificationWindham Regional CommissionWindhamDeerfieldStream Geomorphic Assessment Phase 2Completed$41,600.00
130Stream Geomorphic Assessment along Valley Street, SpringfieldSpringfield TownWindsorBlack and OttauquecheeStream Geomorphic Assessment Phase 2Funded and in Progress$3,250.00
131Mapping Forest Roads, Trails, and Log Landings on Private Forests to Identify Erosion HotspotsCold Hollow to CanadaLake Champlain Basin Forestry - IdentificationCompleted$10,441.00
132Hoosic River Corridor PlanningBennington County Regional CommissionBenningtonBatten Kill, Walloomsac and HoosicRiver Corridor PlanCompleted$30,000.00
133Burlington Stormwater Master PlanningBurlington CityChittendenNorth ChamplainStormwater Master PlanningFunded and in Progress$100,000.00
134Woodford-Packers Floodplain Restoration DesignBennington County Conservation DistrictBenningtonBatten Kill, Walloomsac and HoosicFloodplain/Stream Restoration - Preliminary DesignFunded and in Progress$33,770.00
135Dog River Floodplain Restoration DesignFriends of the Winooski RiverWashingtonWinooskiFloodplain/Stream Restoration - Final DesignCompleted$30,340.00
137Adams Brook Restoration DesignWindham Regional CommissionWindhamWest, Williams and SaxtonsFloodplain/Stream Restoration - Final DesignCompleted$6,050.00
138Northfield Village Green Bioretention InstallationCentral Vermont Regional Planning CommissionWashingtonWinooskiStormwater - ImplementationCompleted$110,695.00
139Village at Dorset Park Stormwater Pond ImprovementsSouth Burlington CityChittendenNorth ChamplainStormwater - ImplementationFunded and in Progress$250,000.00
140Winooski Trees for Streams 2016Winooski Natural Resources Conservation DistrictChittendenNorth Champlain, Lamoille, WinooskiRiver - PlantingCompleted 
141Town of Brighton Storm Water RetrofitsBrighton TownEssexMemphremagogStormwater - ImplementationFunded and in Progress$348,545.00
142NorthWoods Conservation Corps Watershed Crew, 2016NorthWoods Stewardship CenterCaledoniaPassumpsic, Northern ConnecticutRoad Project - ImplementationCompleted$18,615.00
143Lake Shoreland and River Buffer Restoration in the Memphremagog Basin- 2016NorthWoods Stewardship CenterCaledonia, Essex, Lamoille, OrleansMemphremagogRiver - PlantingCompleted$30,736.00
144Western Ave Outfall Stormwater Treatment System InstallationSt. Johnsbury TownCaledoniaPassumpsicStormwater - ImplementationCompleted$107,001.10
145York Street Infiltration Basin Installation - Phase 1Poultney VillageRutlandSouth ChamplainStormwater - ImplementationCompleted$180,000.00
146Adams Street Outfall Stormwater Treatment System InstallationRutland County Natural Resources Conservation DistrictRutlandOtter CreekStormwater - ImplementationCompleted$74,250.00
147Cabot School Stormwater Mitigation - ConstructionFriends of the Winooski RiverWashingtonWinooskiStormwater - ImplementationCompleted$9,522.00
148Kaiser Farm River Corridor EasementVermont Land TrustLamoilleWinooskiRiver Corridor Easement - ImplementationCompleted$42,098.00
149Stickney River Corridor EasementVermont River ConservancyWindhamWest, Williams and SaxtonsRiver Corridor Easement - ImplementationCompleted$35,796.00
150Clough Farm Corridor EasementVermont Land TrustCaledoniaStevens, Wells, Waits and OmpompanoosacRiver Corridor Easement - ImplementationCompleted$174,898.00
152White River Illicit Discharge Detection and EliminationWatershed ConsultingAddison, Orange, Rutland, WindsorWhiteStormwater - IDDEFunded and in Progress$77,010.00
153Montpelier Illicit Discharge Detection and EliminationStone EnvironmentalWashingtonWinooskiStormwater - IDDEFunded and in Progress$43,080.00
154Crooked Creek Gully RestorationFitzgerald Environmental AssociatesChittendenNorth ChamplainFloodplain/Stream Restoration - ImplementationCompleted$40,000.00
155Upper Winooski River Illicit Discharge Detection and Elimination - Follow-up InvestigationStone EnvironmentalLamoille, WashingtonWinooskiStormwater - IDDECompleted$37,175.00
161Regional Hydroseeder Equipment-Share ProgramLamoille County Conservation DistrictCaledonia, Essex, LamoilleLamoille, Stevens, Wells, Waits and Ompompanoosac, Passumpsic, Northern Connecticut, MemphremagogStormwater/Roads EquipmentFunded and in Progress$115,100.00
162Seymour River Stream Geomorphic Assessment/River Corridor Plan Lamoille County Planning CommissionChittenden, LamoilleLamoilleRiver Corridor PlanFunded and in Progress$34,713.00
226Town of Waterbury Stream Geomorphic Assessment and Riparian Corridor PlanningCentral Vermont Regional Planning CommissionWashingtonWinooskiRiver Corridor PlanCompleted$60,960.00
227Upper and Mid-White Stream Geomorphic Assessment and Riparian Corridor PlanningWhite River PartnershipAddison, Rutland, WindsorWhiteRiver Corridor PlanCompleted$77,325.00
228Mill Brook Stream Geomorphic AssessmentSouthern Windsor County Regional Planning CommissionWindsorBlack and OttauquecheeStream Geomorphic Assessment Phase 2Completed$75,038.00
229Upper Winooski River Illicit Discharge Detection and EliminationFriends of the Winooski RiverLamoille, Orange, WashingtonWinooskiStormwater - IDDECompleted$59,340.00
231St. Johnsbury Illicit Discharge Detection and EliminationCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater - IDDECompleted$53,900.00
232Lake Memphremagog Illicit Discharge Detection and EliminationMemphremagog Watershed AssociationEssex, OrleansMemphremagogStormwater - IDDECompleted$49,160.00
235Brewster River Stream Geomorphic Assessment and Corridor PlanningLamoille County Planning CommissionLamoilleLamoilleRiver Corridor PlanCompleted$24,240.00
236Lake Wise Shoreland Buffer Planting Federation of Vermont Lakes and PondsCaledonia, OrleansStevens, Wells, Waits and Ompompanoosac, MemphremagogLake Shoreland - ImplementationCompleted$25,779.00
237Windham County Trees for Streams/Riparian Buffer RestorationWindham County Natural Resources Conservation DistrictWindhamWest, Williams and Saxtons, DeerfieldRiver - PlantingCompleted$15,000.00
238Statewide Trees for Streams, 2014-2015Vermont Association of Conservation DistrictsBennington, Caledonia, Orange, Windham, WindsorBatten Kill, Walloomsac and Hoosic, White, Black and Ottauquechee, West, Williams and Saxtons, Deerfield, Stevens, Wells, Waits and Ompompanoosac, PassumpsicRiver - PlantingCompleted$84,112.00
239Winooski Watershed Targeted Riparian Corridor RestorationFriends of the Winooski RiverWashingtonWinooskiRiver - PlantingCompleted$23,420.00
265Erosion Reduction along Fayston RoadFriends of the Mad RiverWashingtonWinooskiRoad Project - ImplementationCompleted$30,614.00
266Ottauquechee Floodplain Abutment RemovalTwo Rivers-Ottauquechee Regional CommissionWindsorBlack and OttauquecheeFloodplain/Stream Restoration - ImplementationCompleted$48,000.00
270Reducing Residential Stormwater Runoff in the City of BurlingtonLake Champlain InternationalChittendenNorth Champlain, WinooskiStormwater - ImplementationCompleted$13,881.00
271Wells River Corridor Restoration-Tree PlantingWhite River Natural Resources Conservation DistrictOrangeStevens, Wells, Waits and OmpompanoosacRiver - PlantingCompleted$9,267.00
272Black River Corridor EasementsCavendish TownWindsorBlack and OttauquecheeRiver Corridor Easement - ImplementationCompleted$65,975.00
273Pingree Flats Riparian Corridor EasementVermont River ConservancyWindsorBlack and OttauquecheeRiver Corridor Easement - ImplementationCompleted$52,713.00
274Jeffersonville Riparian Corridor EasementJeffersonville VillageLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$19,643.00
322Underhill Stormwater Master Plan Chittenden County Regional Planning CommissionChittendenLamoilleStormwater Master PlanningCompleted$16,105.00
1053Hyde Park and Morristown Stormwater Master Plan Lamoille County Conservation DistrictLamoilleLamoilleStormwater Master PlanningFunded and in Progress$30,000.00
2008Stormwater Master Plan Town of Rupert, Vermont (2015)Bennington County Regional CommissionBenningtonBatten Kill, Walloomsac and Hoosic, South ChamplainStormwater Master PlanningCompleted$10,962.00
2054McKenzie Brook Nutrient Management Planning ProjectUniversity of Vermont ExtensionAddisonSouth ChamplainTechnical AssistanceCompleted$30,000.00
2122Lyndon Stormwater Master PlanningCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater Master PlanningCompleted$42,800.00
2123Sandgate Stormwater Master Plan Bennington County Regional CommissionBenningtonBatten Kill, Walloomsac and HoosicStormwater Master PlanningCompleted$24,000.00
2124Sunderland Stormwater Master Plan Bennington County Regional CommissionBenningtonBatten Kill, Walloomsac and Hoosic, West, Williams and Saxtons, DeerfieldStormwater Master PlanningCompleted$24,000.00
2125Brandon Stormwater Master Plan Brandon TownRutlandOtter CreekStormwater Master PlanningFunded and in Progress$30,000.00
2127Dishmill Brook/Burke Stormwater Treatment Caledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater - ImplementationCompleted$40,970.00
2128Mill Brook Gully Stabilization Bennington County Conservation DistrictBenningtonBatten Kill, Walloomsac and HoosicFloodplain/Stream Restoration - ImplementationCompleted$18,600.00
2129Blackberry Ridge and Walker Hill Road, Williston Streambank Erosion Control Williston TownChittendenWinooskiRoad Project - ImplementationCompleted$28,552.00
2130Green River Corridor Easement, Floodplain Berm Removal, and Buffer Restoration Windham Regional CommissionWindhamDeerfieldFloodplain/Stream Restoration - ImplementationTerminated$0.00
2131Castleton Headwaters Stormwater Master Plan (SWMP)Poultney-Mettowee Natural Resources Conservation DistrictRutlandSouth ChamplainStormwater Master PlanningCompleted$28,000.00
2132Berlin Stormwater Master PlanCentral Vermont Regional Planning CommissionWashingtonWinooskiStormwater Master PlanningCompleted$45,248.00
2133Green Stormwater Infrastucture in the East Creek WatershedRutland County Natural Resources Conservation DistrictRutlandOtter CreekStormwater - Final DesignCompleted$17,050.00
2134Thatcher Brook River Corridor Easement DesignVermont River ConservancyWashingtonWinooskiRiver Corridor Easement - DesignCompleted$5,175.00
2135Agricultural Pollution Prevention Project Planning and Design in the Stevens-Wells-Waits-OmpomanoosuWhite River Natural Resources Conservation DistrictOrangeStevens, Wells, Waits and OmpompanoosacAgricultural Pollution Prevention - Final DesignFunded and in Progress$10,000.00
2136Whetstone Brook Floodplain Restoration and River Corridor Easement Vermont River ConservancyWindhamDeerfieldFloodplain/Stream Restoration - ImplementationFunded and in Progress$84,400.00
2137Gunners Brook Floodplain Restoration Barre CityWashingtonWinooskiFloodplain/Stream Restoration - ImplementationCompleted$100,000.00
2138Poultney River/York Street, Poultney Stormwater Treatment Poultney VillageRutlandSouth ChamplainStormwater - ImplementationFunded and in Progress$420,000.00
2139Barup Farm River Corridor Easement- North Branch Lamoille RiverVermont Land TrustLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$46,494.00
2140Chapman Farm River Corridor Easement Vermont Land TrustOrangeWhiteRiver Corridor Easement - ImplementationCompleted$39,186.00
2141Middle White River Corridor Easement -Freund/Finn PropertyWhite River PartnershipWindsorWhiteRiver Corridor Easement - ImplementationCompleted$70,391.00
2142Upper White River Corridor Easement and Buffer Restoration/Planting (Millard Property) White River PartnershipAddisonWhiteRiver Corridor Easement - ImplementationFunded and in Progress$56,704.00
2143Mad River Corridor Plan Central Vermont Regional Planning CommissionWashingtonWinooskiRiver Corridor PlanFunded and in Progress$27,878.00
2144Lake Carmi Private Camp Roads and Culverts Erosion Assessment Franklin Watershed CommitteeFranklinMissisquoi BayRoad Erosion Control InventoryCompleted$4,000.00
2145Franklin Town Highway Garage Stormwater DesignFranklin Watershed CommitteeFranklinMissisquoi BayStormwater - Final DesignCompleted$9,800.00
2147Fuller Hill Road, Warren Stormwater Treatment DesignWarren TownWashingtonWinooskiStormwater - Preliminary DesignCompleted$9,600.00
2148Franklin Roadside Erosion Control-Lake CarmiFranklin Watershed CommitteeFranklinMissisquoi BayRoad Project - Implementation $0.00
2149Springfield Transfer Station Stormwater Treatment Ottauquechee Natural Resources Conservation DistrictWindsorBlack and OttauquecheeStormwater - Final DesignCompleted$30,230.00
2150Mill Brook Dam Removal at West Windsor Firehouse Southern Windsor County Regional Planning CommissionWindsorBlack and OttauquecheeDam Removal - ImplementationCompleted$19,010.00
2151Equipment to Enhance the Water Quality Benefit of Cover CropsUniversity of Vermont ExtensionFranklinNorth Champlain, Missisquoi Bay, WinooskiAgricultural Pollution Prevention - EquipmentFunded and in Progress$99,554.00
2152Maidstone Lake Shoreland Erosion Assessment Essex County Natural Resources Conservation DistrictEssexNorthern ConnecticutLake Shoreland - IdentificationCompleted$21,000.00
2153Town of Cambridge- Brewster River Floodplain Restoration Lamoille County Conservation DistrictLamoilleLamoilleFloodplain/Stream Restoration - Preliminary DesignCompleted$21,250.00
2154Alburgh School Stormwater Treatment DesignFriends of Northern Lake ChamplainGrand IsleNorth ChamplainStormwater - Preliminary DesignCompleted$6,500.00
2155Fayston and Warren Elementary Schools Stormwater Treatment Friends of the Mad RiverWashingtonWinooskiStormwater - Preliminary DesignCompleted$18,685.00
2156Winhall River Riparian Buffer Restoration/Planting Connecticut River ConservancyWindhamWest, Williams and SaxtonsRiver - PlantingCompleted$3,000.00
2157Fontaine Lane and North Williston Road Roadside Erosion Control Williston TownChittendenWinooskiRoad Project - ImplementationCompleted$18,130.00
2158Agricultural Best Management Practice Implementation in the 1st and 3rd Branch of White RiverWhite River Natural Resources Conservation DistrictOrangeWhiteAgricultural Pollution Prevention - ImplementationCompleted$35,340.00
2163Trout Brook/Andover Branch River Corridor and Floodplain Restoration Southern Windsor County Regional Planning CommissionWindsorWest, Williams and SaxtonsFloodplain/Stream Restoration - ImplementationFunded and in Progress$16,170.00
2174Missisquoi Basin Stormwater Master Planning and Priority Retrofit ProjectFriends of Northern Lake ChamplainFranklin, Grand IsleMissisquoi BayStormwater Master PlanningCompleted$75,000.00
2175Wild Branch River Corridor EasementsVermont River ConservancyLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$68,269.50
2307Bartlett Brook Central Stormwater Infiltration ProjectSouth Burlington CityChittendenNorth ChamplainStormwater - ImplementationFunded and in Progress$400,000.00
2308Potash Brook/Commerce Square, Williston Road, South Burlington Stormwater Treatment South Burlington CityChittendenNorth ChamplainStormwater - ImplementationFunded and in Progress$235,896.00
2399Wetlands Project Outreach & Development under the Regional Conservation Partnership ProgramArrowwood EnvironmentalLake Champlain BasinSouth Champlain, Otter Creek, North Champlain, Missisquoi Bay, Lamoille, WinooskiWetland Restoration - Identification Funded and in Progress$119,999.00
2400Barre City, Barre Town, and Plainfield Stormwater Master PlanCentral Vermont Regional Planning CommissionWashingtonWinooski, Stevens, Wells, Waits and OmpompanoosacStormwater Master PlanningCompleted$95,641.00
2696Northfield Hydroseeder EquipmentNorthfield TownWashingtonWinooskiStormwater/Roads EquipmentFunded and in Progress$6,628.00
2699Green River Corridor Easement/Floodplain Restoration Connecticut River ConservancyWindhamDeerfieldFloodplain/Stream Restoration - Final DesignFunded and in Progress$8,140.00
2968Cold River Floodplain Restoration and Corridor Easement (Ruane Property) Rutland County Natural Resources Conservation DistrictRutlandOtter CreekRiver Corridor Easement - ImplementationFunded and in Progress$75,100.00
2970Passumpsic River/Oak Street, St. Johnsbury Stormwater Treatment Caledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater - ImplementationFunded and in Progress$91,500.00
2971Dog River Floodplain Restoration Friends of the Winooski RiverWashingtonWinooskiFloodplain/Stream Restoration - ImplementationFunded and in Progress$242,039.00
4473Vermont State Parks Lake Shoreland Erosion Control Vermont Department of Forests Parks and RecreationStatewide Lake Shoreland - ImplementationFunded and in Progress$71,472.00
4501Johnson State College Stormwater Treatment-Gihon River Tributary LamoilleLamoilleStormwater - ImplementationTerminated 
4931Lake Iroquois Shoreland Erosion Control Winooski Natural Resources Conservation DistrictChittendenNorth ChamplainLake Shoreland - Final DesignFunded and in Progress$20,299.00
4939Winooski River Trees for Streams Riparian Buffer Restoration/Planting Winooski Natural Resources Conservation DistrictChittenden, WashingtonWinooskiRiver - PlantingCompleted 
4940City of Barre Vacuum Sweeper EquipmentBarre CityWashingtonWinooskiStormwater/Roads EquipmentFunded and in Progress$260,750.00
4941Springfield Vactor Truck EquipmentSpringfield TownWindsorBlack and OttauquecheeStormwater/Roads EquipmentFunded and in Progress$375,000.00
4942City of Barre Vactor EquipmentBarre CityWashingtonWinooskiStormwater/Roads EquipmentFunded and in Progress$340,620.00
4943St. Albans City Street Sweeper EquipmentSt. Albans CityFranklinNorth ChamplainStormwater/Roads EquipmentFunded and in Progress$128,074.00
4944Jay State Forest Restoration and Erosion Control Missisquoi River Basin AssociationOrleansMissisquoi BayForestry - ImplementationFunded and in Progress$37,360.00
4945Mettowee Watershed Forest Roads Erosion Assessment Bennington County Conservation DistrictBenningtonSouth ChamplainForestry - IdentificationFunded and in Progress$11,000.00
4946Rock River Corridor Easement- Choiniere PropertyVermont Land TrustFranklinMissisquoi BayRiver Corridor Easement - ImplementationCompleted$45,507.81
4947Saxtons River Corridor Easement (Kissel Property) Vermont River ConservancyWindhamWest, Williams and SaxtonsRiver Corridor Easement - ImplementationFunded and in Progress$21,000.00
4948Wild Branch Lamoille River Corridor Easement -McCrumb Property Vermont River ConservancyLamoilleLamoilleRiver Corridor Easement - ImplementationCompleted$35,883.00
4949Thatcher Brook River Corridor Easement (Roscioli Property) Vermont River ConservancyWashingtonWinooskiRiver Corridor Easement - ImplementationFunded and in Progress$45,800.00
4950Pekin Brook River Corridor Easement (Armstrong Farm) Vermont Land TrustWashingtonWinooskiRiver Corridor Easement - ImplementationFunded and in Progress$23,800.00
4951LaPlatte River Corridor Easement (O'Neil Farm) Vermont Land TrustChittendenNorth ChamplainRiver Corridor Easement - ImplementationFunded and in Progress$86,633.00
4952Middle White River Corridor Easement (Hull Property) White River PartnershipWindsorWhiteRiver Corridor Easement - ImplementationFunded and in Progress$35,671.00
4953Green River Corridor Easement ScopingVermont River ConservancyWindhamDeerfieldRiver Corridor Easement - DesignFunded and in Progress$2,000.00
4954Saxtons River Tributary Corridor Easement Design (Howe, Willie, and Stiles Brooks)Vermont River ConservancyWindhamWest, Williams and SaxtonsRiver Corridor Easement - DesignFunded and in Progress$2,000.00
4955Williams River Corridor Easement ScopingVermont River ConservancyWindsorWest, Williams and SaxtonsRiver Corridor Easement - DesignFunded and in Progress$6,300.00
4956Passumpsic River Dam Removal at Burke Hollow Road in East Burke Connecticut River ConservancyCaledoniaPassumpsicDam Removal - ImplementationCompleted$150,000.00
4958Curtis Hollow Brook/Coolidge State Forest Road Stream Culvert Removal Vermont Department of Forests Parks and RecreationWindsorBlack and OttauquecheeRoad Project - ImplementationFunded and in Progress$4,060.00
4959Sleeper Pond/Mud Creek Dam Removal Alternatives Analysis in Newport Center Missisquoi River Basin AssociationOrleansMissisquoi BayDam Removal - Preliminary DesignFunded and in Progress$32,450.00
4960Clean Water Projects Planning and Implementation Work Crew (Vermont Youth Conservation Corps)Vermont Youth Conservation CorpsStatewide Road Project - ImplementationFunded and in Progress$189,399.00
4961Echo and Seymour Lake Shoreland Erosion Assessment and DesignNorthWoods Stewardship CenterOrleansMemphremagogLake Shoreland - Final DesignCompleted$14,960.00
4962Easterly Avenue, Rutland City Stormwater Treatment- Moon BrookRutland County Natural Resources Conservation DistrictRutlandOtter CreekStormwater - Final DesignFunded and in Progress$20,000.00
4963North Branch Winooski River Stormwater Treatment- Elmore and Worcester Vermont River ConservancyLamoille, WashingtonWinooskiStormwater - Final DesignCompleted$3,000.00
4964 Managing Stormwater and Reducing Sediment Loads to the Stevens Branch-Montpelier Montpelier CityWashingtonWinooskiStormwater - Final DesignFunded and in Progress$42,000.00
4965Mad River and Kingsbury Branch Stormwater Master Plan Central Vermont Regional Planning CommissionWashingtonWinooskiStormwater Master PlanningFunded and in Progress$140,530.00
4966Hinesburg Town Garage Stormwater Treatment- Beecher Hill BrookLewis Creek AssociationChittendenNorth ChamplainStormwater - Final DesignCompleted$33,189.00
4967Harwood Union Middle and High School, Duxbury Stormwater Treatment Friends of the Mad RiverWashingtonWinooskiStormwater - ImplementationCompleted$29,040.00
4968Pine Shore Road, Hinesburg Stormwater Treatment- Lake IroquoisLake Iroquois AssociationChittendenNorth ChamplainStormwater - ImplementationFunded and in Progress$34,000.00
4969Lamoille River/Wolcott Town Garage and Fire Station Stormwater Treatment Wolcott TownLamoilleLamoilleStormwater - ImplementationFunded and in Progress$15,888.00
4970Clean Water Projects Planning and Implementation Work Crew (Northwoods Stewardship Center)NorthWoods Stewardship CenterOrleansPassumpsicStormwater - ImplementationFunded and in Progress$125,240.00
4971Bennington Bedding Mulcher EquipmentBennington County Conservation DistrictBenningtonBatten Kill, Walloomsac and HoosicStormwater/Roads EquipmentCompleted$5,107.00
4972Munroe Brook/Brook Lane, Shelburne Stormwater Treatment Shelburne TownChittendenNorth ChamplainStormwater - ImplementationCompleted$12,395.00
4974Indian Brook/Fairview Drive and Main Street, Village of Essex Junction Stormwater Treatment Essex Junction VillageChittendenWinooskiStormwater - ImplementationFunded and in Progress$133,069.00
4975Union and Water Street, Northfield Stormwater Treatment - Dog RiverCentral Vermont Regional Planning CommissionWashingtonWinooskiStormwater - ImplementationFunded and in Progress$173,785.00
4976Edgewood Brook/Park-Winter Meadow Neighborhood, Barre City Stormwater Treatment Barre CityWashingtonWinooskiStormwater - ImplementationFunded and in Progress$36,978.00
4977Burke Mountain Academy Stormwater Treatment - Frazier Hall GSI retrofitCaledonia County Natural Resources Conservation DistrictCaledoniaPassumpsicStormwater - ImplementationFunded and in Progress$7,276.00
4978Ayers Brook River Corridor Design and Landowner OutreachTwo Rivers-Ottauquechee Regional CommissionOrangeWhiteRiver Corridor Easement - DesignFunded and in Progress$11,259.00
4980Richmond Stormwater Master Plan Chittenden County Regional Planning CommissionChittendenWinooskiStormwater Master PlanningFunded and in Progress$39,086.00
4981Randolph Stormwater Master Plan Two Rivers-Ottauquechee Regional CommissionOrangeWhiteStormwater Master PlanningFunded and in Progress$19,130.00
4982Deer Brook/Route 7 and Route 104A, Georgia Gully Remediation Friends of Northern Lake ChamplainFranklinLamoilleStormwater - Preliminary DesignFunded and in Progress$86,700.00
4983Potash Brook/Kennedy Drive, South Burlington Stormwater Pond Expansion/Retrofit South Burlington CityChittendenNorth ChamplainStormwater - Preliminary DesignFunded and in Progress$20,000.00
4985West Branch Little River/Stowe Bike Path Floodplain Restoration Stowe TownLamoilleWinooskiFloodplain/Stream Restoration - ImplementationCompleted$276,547.00
4986Acceptable Management Practices for Water Quality on Logging Jobs Manual Design and EditingVermont Department of Forests Parks and RecreationStatewide Education & OutreachFunded and in Progress$28,800.00
4987Municipal Wastewater Treatment Facility Technical Assistance to Optimize for Nutrient TreatmentVermont Rural Water AssociationLake Champlain Basin Technical AssistanceFunded and in Progress$103,000.00
4988Ottauquechee-Black Rivers Illicit/Unauthorized Discharge Detection and ElliminationStone EnvironmentalRutland, WindsorBlack and OttauquecheeStormwater - IDDEFunded and in Progress$69,940.00
4989Statewide Illicit/Unauthorized Discharge Detection and ElliminationWatershed ConsultingAddison, Caledonia, Chittenden, Franklin, Grand Isle, Lamoille, Orange, Orleans, Rutland, Washington, Windham Stormwater - IDDEFunded and in Progress$69,835.00
4990Development of Methodologies for Identifying Subsurface Tile Drains on Agricultural LandsStone EnvironmentalStatewide Mapping and Analytical SupportCompleted$9,926.00
6765Winooski Trees for Streams - 2015- Dillenbeck Property, Charlotte Winooski Natural Resources Conservation DistrictChittendenOtter CreekRiver - PlantingCompleted$1,125.00
6766Winooski Trees for Streams - 2015, R14, Middlesex Winooski Natural Resources Conservation DistrictWashingtonWinooskiRiver - PlantingCompleted$4,500.00
6767Winooski Trees for Streams - 2015, T02, NorthfieldWinooski Natural Resources Conservation DistrictWashingtonWinooskiRiver - PlantingCompleted$6,750.00
6768Winooski Trees for Streams - 2015, M08, Charlotte Winooski Natural Resources Conservation DistrictChittendenOtter CreekRiver - PlantingCompleted$6,660.00
6769Winooski Trees for Streams - 2015, Unnamed Tributary to Lewis CreekWinooski Natural Resources Conservation DistrictChittendenOtter CreekRiver - PlantingCompleted$4,590.00