|
Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HQQ-QKYW-WDEM3
|
|
Current Status:
|
Submitted
|
|
SubVersionID:
|
d5c0a5ff-8568-4699-9ebd-dc572abfff01
|
|
Location:
|
Lower Welden ST. CSO
|
|
Caller Name And Title:
|
Brian Willett Chief Operator
|
|
Incident Start Date:
|
08/10/2026
|
|
Incident End Date:
|
08/10/2026
|
|
Contact Name And Title For Public:
|
Marty Manahan Director of public works
|
|
Public Contact Phone Number:
|
802-524-1500
|
|
Incident Start Time:
|
07:47 pm
|
|
Incident End Time:
|
08:36 pm
|
|
Estimated Volume:
|
83400
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
none
|
|
Waterbody Impacted:
|
Stevens Brook - Lake Champlain
|
|
Description Of Incident:
|
High flows caused by intense rain storm on 8-10-26 resulted in the discharge of a combination of sewage and stormwater from the Lower Welden St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|