Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HQQ-QKQ5-4X4QP
|
|
Current Status:
|
Submitted
|
|
SubVersionID:
|
40eb27fa-e445-4183-8c06-d69736ec8b64
|
|
Location:
|
Park CSO
|
|
Caller Name And Title:
|
Matthew Dow, Director of Wastewater Facilities
|
|
Incident Start Date:
|
08/10/2026
|
|
Incident End Date:
|
08/10/2026
|
|
Contact Name And Title For Public:
|
Matthew Dow, Director of Wastewater Facilities
|
|
Public Contact Phone Number:
|
802.862.6565
|
|
Incident Start Time:
|
09:06 pm
|
|
Incident End Time:
|
10:41 pm
|
|
Estimated Volume:
|
12155
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
None
|
|
Waterbody Impacted:
|
Intervale Wetlands
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on August 10th resulted in the discharge of a combination of sewage and stormwater from CSO (insert CSO number or location). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
This CSO discharged twice during the reported time, each for about 20 minutes. The combined flow has been reported.
|