|
Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HQN-JFEY-9W2DJ
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
3d4c3fc1-9ed6-4554-b931-a407f295b2ee
|
|
Location:
|
CSO 009 - 152 Main St.
|
|
Caller Name And Title:
|
Christopher Cox - Chief Operator
|
|
Incident Start Date:
|
05/14/2026
|
|
Incident End Date:
|
05/15/2026
|
|
Contact Name And Title For Public:
|
Kurt Motyka - Public Works Director
|
|
Public Contact Phone Number:
|
802-223-9511
|
|
Incident Start Time:
|
11:21 pm
|
|
Incident End Time:
|
01:36 am
|
|
Estimated Volume:
|
60416
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
None.
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
None.
|
|
Waterbody Impacted:
|
North Branch
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 5/14/2026 resulted in the discharge of a combination of sewage and stormwater from CSO 009 - 152 Main St. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|