Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HQN-JF93-9GZZ2
Current Status: Deemed Complete
SubVersionID: 4330b6a5-9b82-491c-80ec-4ef01613c4d6
Location: CSO 007 - 10 Main St. (siphon)
Caller Name And Title: Christopher Cox - Chief Operator
Incident Start Date: 05/14/2026
Incident End Date: 05/15/2026
Contact Name And Title For Public: Kurt Motyka - Public Works Director
Public Contact Phone Number: 802-223-9508
Incident Start Time: 10:27 pm
Incident End Time: 02:52 am
Estimated Volume: 32353
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction: None.
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None.
Waterbody Impacted: North Branch
Description Of Incident: High flows caused by an intense rain storm on 5/14/2026 resulted in the discharge of a combination of sewage and stormwater from CSO 007 - 10 Main St (siphon). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.