Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HQN-J2BE-VDKNJ
Current Status: Submitted
SubVersionID: ba2850c2-2a7d-4241-8b4f-c76a188ff20c
Location: CSO – 06: (Bay Street – south of CVPS)
Caller Name And Title: Ethan Graham - Chief Operator
Incident Start Date: 05/14/2026
Incident End Date: 05/14/2026
Contact Name And Title For Public: Steve Beauregard
Public Contact Phone Number: 8027484408
Incident Start Time: 10:40 am
Incident End Time: 04:50 pm
Estimated Volume: 22981
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None
Waterbody Impacted: Passumpsic River
Description Of Incident: High Flows caused by heavy rain on 05/14/2026 resulted in the discharge of a combination of sewage and storm water from CSO - 06. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.