Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HQE-VZR5-MYBYR
|
Current Status:
|
In Review
|
SubVersionID:
|
d34ce331-9ae5-428a-8466-2704dfa1fd10
|
Location:
|
approximately 691 Rte 253 i
|
Caller Name And Title:
|
April Busfield Chief Operator
|
Incident Start Date:
|
08/14/2025
|
Incident End Date:
|
|
Contact Name And Title For Public:
|
April Busfield
|
Public Contact Phone Number:
|
8022667723
|
Incident Start Time:
|
10:00 pm
|
Incident End Time:
|
|
Estimated Volume:
|
1000
|
Nature Of Incident:
|
Discharged untreated sewage
|
Cause Of Discharge:
|
Crack/Hole in Pipe
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Crack/hole in pipe
|
Corrective Action Taken:
|
I have contacted two contractors who will be there Saturday and Monday and hopefully fix it soon. As this is a specialized did. One of the contractors is the person who built the station during the upgrade. The station can not be shut down as all of Beecher falls feeds to it. Laramie recourses was contacted and they agreed with the plan. This will be a big project as bypass pumping will have to be done during.
|
Waterbody Impacted:
|
Connecticut in river
|
Description Of Incident:
|
it appears that there is a leak in the force main after the dry well and check valves, It is a constant trickle so i assume it is not between the dry well and wet well as the pumps flowing does not effect flow
|