Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HQE-VZR5-MYBYR
Current Status: In Review
SubVersionID: d34ce331-9ae5-428a-8466-2704dfa1fd10
Location: approximately 691 Rte 253 i
Caller Name And Title: April Busfield Chief Operator
Incident Start Date: 08/14/2025
Incident End Date:
Contact Name And Title For Public: April Busfield
Public Contact Phone Number: 8022667723
Incident Start Time: 10:00 pm
Incident End Time:
Estimated Volume: 1000
Nature Of Incident: Discharged untreated sewage
Cause Of Discharge: Crack/Hole in Pipe
Type Of Obstruction:
Point Of Discharge: Crack/hole in pipe
Corrective Action Taken: I have contacted two contractors who will be there Saturday and Monday and hopefully fix it soon. As this is a specialized did. One of the contractors is the person who built the station during the upgrade. The station can not be shut down as all of Beecher falls feeds to it. Laramie recourses was contacted and they agreed with the plan. This will be a big project as bypass pumping will have to be done during.
Waterbody Impacted: Connecticut in river
Description Of Incident: it appears that there is a leak in the force main after the dry well and check valves, It is a constant trickle so i assume it is not between the dry well and wet well as the pumps flowing does not effect flow