Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HQE-VZJQ-0BS84
|
Current Status:
|
In Review
|
SubVersionID:
|
81c17be3-ac6d-475f-a188-472c54f72014
|
Location:
|
CSO – 24: (Fairbanks Village behind Middle School)
|
Caller Name And Title:
|
Jim Brimblecombe - Chief Operator
|
Incident Start Date:
|
08/14/2025
|
Incident End Date:
|
08/14/2025
|
Contact Name And Title For Public:
|
Steve Beauregard
|
Public Contact Phone Number:
|
8027484408
|
Incident Start Time:
|
12:40 pm
|
Incident End Time:
|
01:10 pm
|
Estimated Volume:
|
3440
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Sleepers River
|
Description Of Incident:
|
High Flows caused by heavy rain on 08/14/2025 resulted in the discharge of a combination of sewage and storm water from CSO - 24. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.
|