Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HQE-VZHJ-70P86
Current Status: In Review
SubVersionID: db1d3064-0299-4415-8191-2b4705eba5a7
Location: CSO – 06: (Bay Street – south of CVPS)
Caller Name And Title: Jim Brimblecombe - Chief Operator
Incident Start Date: 08/14/2025
Incident End Date: 08/14/2025
Contact Name And Title For Public: Steve Beauregard
Public Contact Phone Number: 8027484408
Incident Start Time: 12:40 pm
Incident End Time: 01:10 pm
Estimated Volume: 2457
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None
Waterbody Impacted: Passumpsic River
Description Of Incident: High Flows caused by heavy rain on 08/14/2025 resulted in the discharge of a combination of sewage and storm water from CSO - 06. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system and to prevent backups into homes and other buildings.