Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HQB-JTJ4-JWT1V
|
Current Status:
|
Submitted
|
SubVersionID:
|
14288204-9ab1-47d3-b379-a9ac82f08a00
|
Location:
|
Outfall
|
Caller Name And Title:
|
Kean Galunas Chief Operator
|
Incident Start Date:
|
04/02/2025
|
Incident End Date:
|
04/16/2025
|
Contact Name And Title For Public:
|
Kean Galunas Chief Operator
|
Public Contact Phone Number:
|
802-723-4424
|
Incident Start Time:
|
07:20 am
|
Incident End Time:
|
07:14 am
|
Estimated Volume:
|
1537000
|
Nature Of Incident:
|
Discharged treated and partially disinfected effluent
|
Cause Of Discharge:
|
Other - Please describe in Description of Incident
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
The chlorination rate was increased, and a follow up e. coli test was performed on 09 Apr.
That result was 240 MPN/100 ml, which was still over the 235 public notification level. Another sample taken on 16 Apr had a result of 21 MPN/100 ml, allowing this notification to be closed.
|
Waterbody Impacted:
|
Pherrins River / Clyde River
|
Description Of Incident:
|
Recent rains and spring runoff reduced detention time in the chlorine contact tank, hindering efforts to achieve adequate disinfection. An e. coli test conducted on 02 Apr showed a result of 1100 MPN/100 ml, triggering public notification.
|