Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HQ2-T26H-KEQQ4
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
bf406f6e-0aa8-411d-9535-574e66bea88c
|
Location:
|
outfall wwtf-Harriman reservoir
|
Caller Name And Title:
|
Christopher Hayes operator
|
Incident Start Date:
|
04/08/2024
|
Incident End Date:
|
04/23/2023
|
Contact Name And Title For Public:
|
Christopher Hayes
|
Public Contact Phone Number:
|
802-793-9429
|
Incident Start Time:
|
10:00 am
|
Incident End Time:
|
02:17 pm
|
Estimated Volume:
|
1,000 to 10,000 gallons
|
Nature Of Incident:
|
Discharged treated and partially disinfected effluent
|
Cause Of Discharge:
|
Other - Please describe in Description of Incident
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Increased water level in influent tank and raised the pump up to a higher level to prevent solids from passing through the pump.
Decrease the frequency of pump relocation.
Suggested changing the temporary pump to a smaller gpm.
Lowered gpm
cleaned effluent piping, cleaned UVs.
now 52 count
|
Waterbody Impacted:
|
Harriman Reservoir
|
Description Of Incident:
|
Plant under construction, running on temporary pump. Pump set too low in influent tank #1. E-coli level too high.
Temporary Pump location is being changed to accommodate construction from tank to tank.
|